1 / 5

ICRF Task Force Summary

ICRF Task Force Summary. Presented by Yijun Lin. ICRF Scenarios on C-Mod (I). this forum. ICRF Scenarios on C-Mod (II). J antenna has never been run at 53 MHz, 60 MHz, and 40 MHz. Only feasible to try them out in long campaigns. New Ideas/Presentations. Y. Lin:

barney
Download Presentation

ICRF Task Force Summary

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ICRF Task Force Summary Presented by Yijun Lin

  2. ICRF Scenarios on C-Mod (I) this forum

  3. ICRF Scenarios on C-Mod (II) • J antenna has never been run at 53 MHz, 60 MHz, and 40 MHz. • Only feasible to try them out in long campaigns.

  4. New Ideas/Presentations • Y. Lin: • ELMs on antenna loading and FFT commissioning (mostly piggy-back) • MC and LHCD synergy (J antenna at 50 MHz. Needs LH) • ICRF MC and ITB formation and density control (J antenna at 60 MHz) • S. Wukitch: • ICRF sheaths using marker tiles (78 MHz, normal and reversed field) • ICCD for sawtooth control (78 MHz, CD phase) • MCCD sawtooth control in monster sawtooth (50 MHz, D(He3), CD phase) • M. Porkolab (P. Bonoli presented): • 2nd harmonic minority heating (J antenna 78 MHz or 40-45 MHz. D(H) or D(He3). Low field). • C. K. Phillips: • Fast wave heating and CD below all IC resonances (40 MHz, high field. Needs LH to boost Te)

  5. Open ICRF Mini-Proposals • D(He3) minority heating evaluation (Wukitch, MP390) • ICRF on sawtooth behavior (Wukitch, MP380) • High power experiment (Wukitch, MP379) • MC flow drive (Lin, MP378) • Plasma performance (Lin, MP376/388, MP417) • MCCD (Parisot, MP356, MP447) • CNPA test and calibration (Tang, MP389) Total run time from new ideas: ~10 days • Prioritizing meeting: • Ranking the ideas/MPs. • J-antenna frequencies.

More Related