1 / 6

Task force

Programming Alpine Space II, 2007 – 2013 The Actors. MA. WG finance. JTS. Speaker of WG. Expert SEA. Task force. S. WG structure. E. Expert EaE. WG content. M. Moderator. C. Experts content. S. Supporter. Facilitation team. S. M. Supporter. Moderator. 2. 3. 4. 5. 6. 7.

gianna
Download Presentation

Task force

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Programming Alpine Space II, 2007 – 2013 The Actors MA WGfinance JTS Speaker of WG Expert SEA Task force S WG structure E Expert EaE WGcontent M Moderator C Experts content S Supporter Facilitation team S M Supporter Moderator

  2. 2 3 4 5 6 7 16.5. 12.6. 1st draft 2nd draft 13.7. 3rd draft 4.8. 4th draft 13.10. Final Draft 31.10. 28.4. 22.6. 12.6. 27.4. 17.5. 22.6. 7.6. ROADMAP ASP II 2006 12.5. 27.4. 18.5. 14.6. Indicators6.7. „Inventory“16.5. SWOT2.6. Draft 11.8. Final 31.10. Draft 30.9. Ongoing (written&oral) feedback Pre-Draft 18.7. Draft 11.8. Final 31.10. Publicconsultation Scoping facilitated by

  3. 2 3 4 5 6 7 16.5. 12.6. 1st draft 2nd draft 13.7. 3rd draft 4.8. 4th draft 13.10. Final Draft 31.10. 28.4. 22.6. 12.6. 27.4. 17.5. 22.6. 7.6. ROADMAP ASP II 2006 12.5. 27.4. 18.5. 14.6. Indicators6.7. „Inventory“16.5. SWOT2.6. Draft 11.8. Final 31.10. Draft 30.9. Ongoing (written&oral) feedback Pre-Draft 18.7. Draft 11.8. Final 31.10. Publicconsultation Scoping facilitated by

  4. 2 3 4 5 6 7 16.5. 12.6. 1st draft 2nd draft 13.7. 3rd draft 4.8. 4th draft 13.10. Final Draft 31.10. 28.4. 22.6. 12.6. 27.4. 17.5. 22.6. 7.6. ROADMAP ASP II 2006 12.5. 27.4. 18.5. 14.6. Indicators6.7. „Inventory“16.5. SWOT2.6. Draft 11.8. Final 31.10. Draft 30.9. Ongoing (written&oral) feedback Pre-Draft 18.7. Draft 11.8. Final 31.10. Publicconsultation Scoping facilitated by

  5. 2 3 4 5 6 7 16.5. 12.6. 1st draft 2nd draft 13.7. 3rd draft 4.8. 4th draft 13.10. Final Draft 31.10. 28.4. 22.6. 12.6. 27.4. 17.5. 22.6. 7.6. ROADMAP ASP II 2006 12.5. 27.4. 18.5. 14.6. Indicators6.7. „Inventory“16.5. SWOT2.6. Draft 11.8. Final 31.10. Draft 30.9. Ongoing (written&oral) feedback Pre-Draft 18.7. Draft 11.8. Final 31.10. Publicconsultation Scoping facilitated by

  6. Programming Alpine Space II 2007 – 2013 Making the Alpine Space a European model for territorial cohesion successfully facing competitiveness challenges, through valorisation of the socio-economic, natural and cultural assets and better use of the innovation potentials

More Related