1 / 7

d: 6-10cm, l: 8-10m felling, cutting, and pruning: 4minutes debarking: 16minutes

Stone Age wood working with stone, bone and antler tools. 18-21.5.2010 in Kierikkikeskus, Yli-Ii, Finland.

barr
Download Presentation

d: 6-10cm, l: 8-10m felling, cutting, and pruning: 4minutes debarking: 16minutes

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Stone Age wood working with stone, bone and antler tools.18-21.5.2010 in Kierikkikeskus, Yli-Ii, Finland -Kierikki Stone Age Center is renovating and building new Stone Age style houses. This experiment was planned to get information on how long does it take to prepare wood material with Stone Age tools for a timber framed Stone Age style house. The experiment took place between 18th and 21th of May 2012. -The experiment was designed and conducted by Kuttelo members Hanni Haapaniemi, Mikke Reinikainen, Jasse Tiilikkala, Matias Toivanen and Miika Vanhapiha. The tools used were made by Miika Vanhapiha. Pictures were taken by Jasse Tiilikkala and Hanni Haapaniemi. -Tools in use; Two sets of bone and stone chisels, two stone axes, three moose antler axes, small stone adze and reindeer antler for debarking.

  2. Working with Stone Age toolsFew estimated average results for different working phases with different sized timber (pine, pinus sylvestris)d=diameter, l=length d: 6-10cm, l: 8-10m felling, cutting, and pruning: 4minutes debarking: 16minutes d: 13-16cm, l: 13-14m felling, cutting and pruning: 30minutes debarking: 22minutes d: 19-24cm, l: 6m felling, cutting and pruning: 1h25minutes debarking: 1h concave notching both ends of the log: 1h30minutes

More Related