E N D
1. Fire Station Strategic Planning & Implementation
2. to serve our Community
with the following core values:
Integrity
Professionalism
Compassion
Unity
Honor
Our Values
3. To meet community needs
by delivering an
effective system of services;
thereby minimizing the impact of
fire, hazardous conditions,
illness, and injury
with a caring and efficient response.
Mission Statement
4. Objective To identify station configuration profiles that are most conducive for delivering the optimal emergency service delivery system, given our personnel, equipment and budgetary resources.
5. Considerations Community expectations (Service)
Target hazards
Alarm response patterns
Land availability
Budgetary constraints (Sustainability)
Demographics
Zoning
6. Community Expectations Timely response
All hazards mitigation
Fiscal responsibility
Minimal disruption
7. Target Hazards Medical facilities
Assisted living facilities
Schools
High-rise structures
Industrial complexes
Multi & Single family occupancies
Occupancies of assembly
8. Current Facilities The existing Stations and sites generally suffer from the same deficiencies
Undersized and inefficient for their intended use
Non compliant with current building code requirements or Fire Service Standards
None are in optimal locations and all are on undersized lots.
9. Notable Deficiencies Bays too small for modern fire apparatus
Mixed genders sleeping quarters
Decontamination facilities
Multi hazard training requirements
Technological capabilities
Lack of dedicated turnout gear rooms
10. 5 station response model
Apparatus & equipment locations
Crew configurations
Identified general site locations
Retain station 33
11. 2 bays station - Engine & Medic
8,000 sq. ft.
3 bays - Engine, Ladder, Medic 12,600 sq. ft.
4 bays - Engine, Ladder, Medic, Battalion
15,400 sq. ft.
*Project cost range (2.3 M 4.5 M) Proposed Facilities
12. Station 32 Built 1973
6,439 sq. ft.
E-L-M
12,600 sq. ft.
13. Station 35
14. 3484 Far Hills
15. West central location
Access to major thoroughfares
Covers major west central target hazards
Meets response model recommendations
Site accommodates recommended station configurations
Availability
17. Next Phase Far Hills Property acquisition
Property availability for other stations
Response model recommendations
Budgetary constraints