DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office
Zion Crossroads Interchange Improvements Corman Construction Co./Parsons Transportation
* * I-564 Intermodal Connector advertised by EFLHD
Rte 60 Bridge Replacement in the Town of Clifton ForgeOrders Construction/Clark-Nexsen
Route 460 Connector (Phase I)Bizzack Construction/AMT / ENTRAN / Janssen & Spaans
RECENT INITIATIVES • Use of incentives • Use of options for additional work • Responsible Charge Engineer for complex DB projects • Use of ATCs
DESIGN-BUILD LESSONS LEARNED • Environmental • Wetland Delineation • Threaten & Endangered Spices – Long-Eared Bats • HAZMAT studies – Phase I & II • Survey – Type of survey and accuracy • SUE Survey – Level B designation for all underground utilities • Geotechnical Data Report – appropriate investigation of ground water elevation to determine feasibility of preliminary type and location of storm water facilities • Utilities – Advance communication with the Owners, expecting owner to provide prior rights determination, and advance relocations where appropriate • Right-of-Way – Advance acquisitions for total takes where appropriate
DESIGN-BUILD CONCERNS • Design submittal quality • Post-award interpretation of standards and specifications • Construction quality • DBB mindset • Partnering
DESIGN-BUILD PROJECTS - ADVERTISED CY 2015 • Three (3) DB projects Advertised Valued at - $236M • I – 64 Peninsula Widening (Segment II) - $185M • GRTC Pulse: Bus Rapid Transit (BRT) - $38M • I-81 over Rte. 808 (Halls Bottom Rd) and Sinking Creek - $13M
DESIGN-BUILD PROJECTS TO BE ADVERTISED • Three (3) DB projects to be Advertised Valued at - $211M • Route 630 (Courthouse Road) and Interstate 95 Interchange Reconstruction - Fredericksburg District, UPC 13558 (RFQ release late 2015) - $102.5M • Route 606 Bridge Replacement over I-95 with 606 Improvements - Fredericksburg District, UPC 105463 and 100829 (RFQ Release Late 2015) - $23.5M • Route 220 Corridor Safety Improvements, Salem District - UPCs 105543 and 105544 (RFQ release Summer 2016) - $85M
POTENTIAL DESIGN-BUILD PROJECTS* • I-64 Peninsula Widening Segment III, Hampton Roads District, UPC 106689 • Bridge Replacement: I-81 over Reed Creek and Rte. 697 (Formato Lane), Bristol District, UPC 104936 • Bridge Replacement: I-81 over Rte. 686 (Mulberry Lane), Bristol District, UPC 107117 • I-64 Widening from I-295 to Exit 205, Richmond District, UPC 107458 • *It is anticipated that the projects listed above will be advertised using the Design-Build project delivery method. The list is subject to change.