1 / 9

Projects

Projects. Each study group will ‘develop’ a system. System to be selected by the group from list (next slide) or approved by Bell. I’m your customer. You will define all the steps and documents. Define and selectively develop program schedule, system, documents.

bcrawley
Download Presentation

Projects

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EMIS 7307 Projects • Each study group will ‘develop’ a system. • System to be selected by the group from list (next slide) or approved by Bell. • I’m your customer. • You will define all the steps and documents. • Define and selectively develop program schedule, system, documents. • Emphasis is on all integration aspects and appropriate testing along the way to customer acceptance. • Each group will develop a SEMP, a TEMP and an A spec. • Each group will make a presentation (1 hour). • Every member presents • Each presentation is a portion of a major design or test review.

  2. EMIS 7307 Systems for Projects • Select one or suggest one to Bell for approval: • Automobile • Airplane • Distributed computing • Train • Spacecraft • Health monitoring

  3. EMIS 7307 Systems for Projects • Automobile: • Seats 5 -220 lb, 6’5’’ adults. • 0-60 mph in 6 sec. • Accelerates as quickly as it stops. • Has auto-steer and auto-trip capability: • New capability that uses GPS and obstruction sensing to navigate safely from place to place. • 2 years to IOC.

  4. EMIS 7307 Systems for Projects • Airplane • Must host surveillance equipment (provided by another vendor). • Accommodates aircrew and 5 sensor operators. • Delivered with operator USI subsystems installed. • Must fly from unimproved airfields. • Used by all military services. • All weather flying capability. • 4 years to IOC, if modified. • 6 years to IOC, if new aircraft.

  5. EMIS 7307 Systems for Projects • Distributed computing: • World -wide interconnected users. • Business data processing. • Scientific data analysis. • Includes all communication, computing and data storage. • 2 years to IOC.

  6. EMIS 7307 Systems for Projects • Passenger train: • Magnetically levitated. • 220 mph normal cruise. • Less than 80dB noise at 15 feet from train. • May use modified version of existing cars for passengers. • Include first 100 miles of ‘track’ from DFW to Waco. • 3 years to IOC.

  7. EMIS 7307 Systems for Projects • Spacecraft: • Mercury mapper. • Both IR and radar. • Directed subcontractors for the sensors. • 3 year on-station life. • Uses existing ground stations. • 3 years to launch from shuttle in orbit.

  8. EMIS 7307 Systems for Projects • Health monitoring: • Used to monitor ambulatory patients from their homes. • Realtime notification of physicians of out of tolerance parameters (50). • Directed subcontractors for the sensors. • 5 years between mandatory service. • Automatic instructions to patient i.e. not just an alarm. • 2 years to competitor’s “roll-out”.

  9. EMIS 7307 Instructions • Develop “mini”(10 pages each): A Spec with section 4, SEMP, and a Master Test Plan. • Define subsystems and their performance requirements. • Include engineering organization with roles and responsibilities. • Use IPTs. • Summarize written documents for a Powerpoint classroom presentation of which everyone presents an approximately equal portion. • For the remaining information you need to know to do your project... ask Bell. • If no answer in two days, make and document your assumptions then continue.

More Related