An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Environmental Considerations in LBRC TOT on Environmentally Sound Design and Implementation of PWs Community Roads of the PSNP June 13 – 23, 2011 Dessie, Ethiopia By DessalegnBezabih

  2. Environmental Considerations in LBRC • The first step of Environmental Friendly LBRC is to exercise Watershed based planning as per the Community-Based Participatory Watershed Dev’t Planning (CBPWDP), • The next step is to implement the screening of PWs for their environmental compliance using the Environmental and Social Management Framework (ESMF) of the PSNP, • The last step is to conduct environmental monitoring to track the impact of projects on the environment, • Insure sustainability of PWs (social, managerial, technical, environmental and financial or Op/MT).

  3. Environmental considerations (Cont’d) • Environmental measures along LBRC projects: • Physical measures: • Proper surface drainage systems (ditches, interceptors, mitre drains with appropriate intervals), • Environmentally safe drainage structures (safe flood water disposal, riprap, apron), • Scour checks at ditches and chute at steep slopes, 2. Biological measure: • Grass soading of embankment fills, • Grassed side ditches, mitre drains, structure outlet channels, • Slope stabilization grass or bush planting (vetiver, sisal, cactus, etc) 3. Application of Bio-engineering for road maintenance.

  4. Environmental considerations (Cont’d) Other points: • Low cut and fill. • Less destruction of forest by re-aligning routes, • Less damage to farm land to avoid social issues, • Involve sectors like Agriculture staff during road construction to let them contribute their responsibility before damage occurs for example in protecting the areas outside Road Way Limit.

  5. Video Show ILO Video

  6. Training of Trainer Personnel on Environmentally Sound Design andImplementation of Public Works-Community Roads of the ProductiveSafety Net Program (PSNP) June 13-24, 2011 Ghion Ambassel Hotel Dessé, Ethiopia