1 / 3

MO141 Pervious Shoulders

MO141 Pervious Shoulders. The southbound lanes of MO141 before the land o woods bend have two separate pervious concrete shoulder sections. Each section is 75 feet long. TX Active (north). Control (south).

bebe
Download Presentation

MO141 Pervious Shoulders

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MO141 Pervious Shoulders The southbound lanes of MO141 before the land o woods bend have two separate pervious concrete shoulder sections. Each section is 75 feet long

  2. TX Active (north) • Control (south) The northern section is pervious concrete containing TX Active (self-cleaning) cement. The southern section contains conventional cement.

  3. Both section layouts are the same. North 25ft has tile line embedded at the bottom of the aggregate base Center 25 feet is a separation section. There is a water level sensor in a standpipe that can be left in place. The standpipe is right against the crash barrier. Travel Lanes South 25feet have strip drain to collect water from roadway. Since this section is used to collect roadway water, the pervious will not need to be replaced.

More Related