60 likes | 171 Views
ACORDE FOR TPC TEST Status report. Top Modules. Bottom Modules. Electronic system. User Interface. Status. All the 20 ACORDE modules, electronics cards and cables have been tested before the instalation on the structure. The top and bottom structures are inside the clean room.
E N D
Status • All the 20 ACORDE modules, electronics cards and cables have been tested before the instalation on the structure. • The top and bottom structures are inside the clean room. • The 10 ACORDE modules on top have been tested inside the clean room. • The ACORDE user interface has been finished. • The last test with the top and bottom modules will be made next week. • ACORDE will be ready for the TPC test on the 1st May.