Driving QAD to the Factory Floor Cascade Engineering September 24, 2012
Cascade Engineering • Founded in 1973 • Provider of Engineered Plastic Systems and Components • 1000 Employees in 14 Facilities • Implemented QAD in 1999 • Cascadeng.com
QAD Business Partners • Eagle Shop Floor Data Collection • EAM Enterprise Asset Management • Cebos Quality Management • Vertex Sales Taxes • Unicorn HRO Human Resources • PICS Custom Code • RCM Custom Code
Fred Keller’s Vision • Monitor Individual Plants • Monitor Presses within plant • Display on Desktop • Love of technology drove development
Factory Link • First CE Manufacturing Execution System • 1986 • Uptime • Down • Production • Need to set up job standard • Input schedule manually • Dumb terminals at press
Manufacturing Operations Data System (MODS) • 2001 • Start of QAD Integration • Use data from QAD if available • Part description • Routing information • Weights
Advance Repetitive Integration • 2002 • Data from rps_mstr • No longer enter manual schedule • New Plant Schedule Screen • Combines, Splits, Priority, & Sequence
Eagle Integration • 2004 • Performs BKF transaction • Minor setup at beginning of shift • One Click generates a backflush and prints a label • Cart stacker does not require one click • CKF = Custom BKF to capture serial numbers
Bill of Material Integration • 2006 • BOM verification at start of job • Bottom of screen is filled out and saved • BOM shows quantity available and quantity short.
Operation Scrap Integration • 2006 • Captured real time • Sent to QAD at end of shift • End of Shift Editor (EOS) provided • Scrap reason code down tree provided • Pick cavity • Capture problem description
Webpage Interface • 2009 • Eliminated PC install • Available anywhere with VPN connection
Unplanned Issues Integration • 2011 • Secondary Operations Done at Press • Sub Component Scrap • Bill of Material display for selection • Sent to QAD from EOS editor
MSW/PSW Integration • 2011 • Early Adopter • One Site at Time • Changes to Advance Repetitive • rps_mstr vs wo_mstr • Sequencing of work done in PSW • SC and OC comments
EAM Integration • MLS and DUOM • Implemented EAM • Equipment failure creates EAM work order • Easy access to equipment work orders