1 / 4

News

News. Richard Plackett has presented a poster at Pixel2010 Poster is attached to this agenda Testbeam paper (2009 ) status (following slides) We would like to organise an readout workshop focussing on links, connectors etc. sometime in November, email to follow. Testbeam 2009 publication.

berget
Download Presentation

News

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. News • Richard Plackett has presented a poster at Pixel2010 • Poster is attached to this agenda • Testbeampaper (2009) status (following slides) • We would like to organise an readout workshop focussing on links, connectors etc. sometime in November, email to follow

  2. Testbeam 2009 publication • Progressing slowly • Some new results shown today • Decision to include simulation to be taken shortly • Syracuse standalone simulation • ErlanganGeant based simulation (new) • Remaining areas: • High number of unused clusters mystery • Correspondence needed for entire paper between THL setting and threshold in electrons – solved • Track extrapolation precision simulation/data mismatch LHCb Upgrade Meeting Paula Collins

  3. Status of 2009 paper (not much movement) • https://gligorov.web.cern.ch/gligorov/timepixpaper.pdfComments welcome at any stage • Thanks to our heroic editor Vava! (no need to polish your figures etc. he will do this) • Status of the sections: • Timepix chip description (RP) • Timepix Telescope description (RP) • Determination of calibration parameters and threshold (MA) • Clustering algorithm & results (PC, VG, ZX) • Tracking (PC) • Alignment (PC,JG) • Track Pointing Precision (PC) • Data Sets(PC) • Determination of zero angle (ZX) • General Cluster characteristics (looking for a volunteer!) • Landau distributions in DUT (Syracuse group) • Efficiency and noise as a function of threshold (HG) • Timewalk(MvB) • Pulseshape (Syracuse group) • HV Scans (ZX,PC) • Angle Scans – clusters (ZX), resolutions(PC) • 45 degree data angle scans (Syracuse group) • Row column asymetries(TM, FB) • Ikrum scans (DH) • 3d sensor (GS) Text and plots exist Plots exist – text on the way Work to do LHCb Upgrade Meeting Paula Collins

  4. For the 2010 paper, analysts still needed • Resolution scan analyses • Gain variation of pixels from long runs... • Pointing precision analysis – will be better than 2009! • PR01 analysis is on the way • NEW testbeam data! • Lots of interesting subjects! LHCb Upgrade Meeting Paula Collins

More Related