1. Passamaquoddy Tribe at Pleasant Point algae to Oil Project Steve Crawford, M.Sc
Environmental Director
1
2. Overview and Background Tribal energy mission statement: To be 100% self-sufficient in energy, while safeguarding the Tribe’s lands, waters, air, human health, and culture.
Projects under development:
Commercial wind – 50.5 MW wind project on Blueberry farm
In-stream tidal power, two-FERC approved sites in Passamaquoddy Bay
Half-moon Cove tidal barrage 10 MW project
Geothermal project with Passamaquoddy Bay for heat
Domestic wind turbines, solar panels
2
3. 3
4. 4
5. Subsea Aquamedics turbine 5
6. 6
7. 7
8. Sipayik 100 gal. bio-reactor, sewage treatment plant (250 ml/4 day) 8
9. Gothic Solar Greenhouse, 18’x 20; $4119. 9
10. 10
11. Costs 18’ x 10’ x 24’ greenhouse: $4,450
60- 10” x 6 ft acrylic tubes = $3,760
Air pump=$
CO2 supply $500
Plumbing= $3,000
Floor and sill= $600
Extraction process= $4,000
Installation= 40 m-hr @$20/hr= $800
TOTAL = $17110, rounded up to $20k 11
12. Summary Projection and hopes:
If capital and installation costs = $20k;
operating costs = $20/month or 100/year
And oil production is 400 gal/season, over a 15 yr period oil would be $3.58/gal. (Maine oil cost today is 3.24)
20 years = $2.75 gal.
KEY POINT-SELF SUFFICIENT! 12