Passamaquoddy Tribe at Pleasant Point algae to Oil Project

Overview and Background. Tribal energy mission statement: To be 100% self-sufficient in energy, while safeguarding the Tribe's lands, waters, air, human health, and culture.Projects under development:Commercial wind

bernad
Download Presentation

Passamaquoddy Tribe at Pleasant Point algae to Oil Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Passamaquoddy Tribe at Pleasant Point algae to Oil Project Steve Crawford, M.Sc Environmental Director 1

    2. Overview and Background Tribal energy mission statement: To be 100% self-sufficient in energy, while safeguarding the Tribe’s lands, waters, air, human health, and culture. Projects under development: Commercial wind – 50.5 MW wind project on Blueberry farm In-stream tidal power, two-FERC approved sites in Passamaquoddy Bay Half-moon Cove tidal barrage 10 MW project Geothermal project with Passamaquoddy Bay for heat Domestic wind turbines, solar panels 2

    3. 3

    4. 4

    5. Subsea Aquamedics turbine 5

    6. 6

    7. 7

    8. Sipayik 100 gal. bio-reactor, sewage treatment plant (250 ml/4 day) 8

    9. Gothic Solar Greenhouse, 18’x 20; $4119. 9

    10. 10

    11. Costs 18’ x 10’ x 24’ greenhouse: $4,450 60- 10” x 6 ft acrylic tubes = $3,760 Air pump=$ CO2 supply $500 Plumbing= $3,000 Floor and sill= $600 Extraction process= $4,000 Installation= 40 m-hr @$20/hr= $800 TOTAL = $17110, rounded up to $20k 11

    12. Summary Projection and hopes: If capital and installation costs = $20k; operating costs = $20/month or 100/year And oil production is 400 gal/season, over a 15 yr period oil would be $3.58/gal. (Maine oil cost today is 3.24) 20 years = $2.75 gal. KEY POINT-SELF SUFFICIENT! 12