JICA's Activities for Development of Infrastructure in Mongolia Japan International Cooperation Agency Mongolia Office October,2013
Project Period: Aug 2013 – Sep 2015 Project Purpose: Ministry of roads, transportation's and municipality of UB's capacity for planning skills of bridge maintenance is improved. Targeted Outputs: 1) Concept of "Bridge management cycle" is widely understood, and guidelines and/or manuals are developed. 2) Database system to record information of bridges is developed in nation-wide and UB. 3) National policy on bridge maintenance and management are developed. 4) Staff members related to bridge / structure maintenance and management in MRT and MUB are trained, and trainings are conducted by Mongolian side. TA for Sustainable Bridge Maintenance and Management
JICA's Experience of Infrastructure Projects Urban Development Master Plan • Urban development master plan is one of JICA’s technical cooperation activities which support 1)analysis of urbanization trend, 2)planning concepts, 3)development land use, and 4)formulation of prior project plan.
JICA's Experience of Infrastructure Projects Airport • Activate economic development by enhancing aerial transportation for the logistics and movements of passengers
JICA's Experience of Infrastructure Projects Urban Mass Rapid Transit • Reduce traffic congestion and environmental load • Revitalize economic activity of the urbanized area
JICA's Experience of Infrastructure Projects Disaster Management • Formulate hazard map • Construction of evacuation facility • Emergency assistance (Japan Disaster Relief team)
JICA’s Infrastructure Projects in Mongolia Approval on February 2013 Ulaanbaatar Master Plan 2020 JICA’s Master Plan in 2009
JICA’s Infrastructure Projects in Mongolia On-going/Planned □water supply and sewerage Study Completed □Seismic Disaster Risk Study ◎Grant Aid △Yen Loan □T/A ◎□Narangiin Enger Disposal Site △Metro Study ◎△□Thermal Power Plant #4 Railway ◎Improving the Roads (Narnii Zam) △Ajilchin Flyover Study ◎Solar Power Generation ◎Railway Fly-over (Narnii guur) ◎Water Supply Facilities in UB △New UB International Airport
JICA’s Infrastructure Projects in Mongolia Railway Flyover (Narnii Guur) • Grant Aid Project • Project Cost: 3.6 Billion JPY • Bridge Length: 260m • Connecting Road: 630m • First Large Metal Bridge in Mongolia
JICA’s Infrastructure Projects in Mongolia New Ulaanbaatar International Airport • Yen Loan Project • Solution for demand increase of aviation movements • Construction of new global gateway to Mongolia as landlocked country
JICA’s Infrastructure Projects in Mongolia FEASIBILITY STUDY OF UB METRO • PPP-FS Scheme • Proposed by Master Plan 2020 • To reduce traffic congestion • To promote underground development in Ulaanbaatar
JICA’s Infrastructure Projects in Mongolia Improvement of capacity of 4th Power Plant • Collaboration of Yen Loan, Grant Aid, TA and Volunteers • Supporting the economic development as basic infrastructure since 1990
JICA’s Infrastructure Projects in Mongolia New Water Pipe (18.8km) Water project by WBunder USIP2 New Water Sources (21 wells) Water Supply Development in Gachuurt • Grant Aid project • Scheduled for completion in November 2014 • Benefit 390,000 ger area and 40,000 urban area residents • To provide the basic social service to ger area residents
JICA’s Infrastructure Projects in Mongolia Narangiin Enger Disposal Site & Solid Waste Management • Collaboration of Grant aid and TA • Construction of new disposal Site • Provision of equipment, garbage trucks • Capacity development for maintenance and management • First sanitary landfill in Mongolia
JICA’s Infrastructure Projects in Mongolia • TA: Strengthening the Capacity of Seismic Disaster Risk Management (2012-2013) • To enhance disaster prevention ability by risk mapping , formulating disaster prevention planning, and, capacity development • Grant Aid: Improvement of Capacity of Fire Fighting Techniques and Equipment(2013) • Provision of 22 units fire truck, water tank car, car lighting etc. • Grant Aid: Improvement of Fire Fighting Equipment and Maintenance Workshop(2001) • Maintenance of equipment and provision of 17 units fire fighting vehicle • Countermeasure against urbanization risks
Capacity Development PROJECT for Urban Re-Development JICA’s Infrastructure Projects in Mongolia • Technical Assistance Project • Technology transfer the concept of land readjustment in Japan • Formulating urban re-development legal system • To reduce traffic congestion and air pollution in Ulaanbaatar
JICA will support infrastructure development; -as new solutions for challenges in Mongolia, -as contribution for people’s life in Mongolia