Captive Coal Block Assessment Toolkit

Bharatbook.com announces a report on “Captive Coal Block Assessment Toolkit”. The Supreme Court has directed the Government of India to scrap all captive coal block allocations made since 1993. In observance of the same the Government of India (GOI) has come out an ordinance clearly outlining its position on competitive bidding of coal blocks and has marked coal blocks to be auctioned under different schedules (Schedule I to Schedule III).

Download Presentation

Captive Coal Block Assessment Toolkit

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Captive Coal Block Assessment Toolkit

  2. Summary The Supreme Court has directed the Government of India to scrap all captive coal block allocations made since 1993. In observance of the same the Government of India (GOI) has come out an ordinance clearly outlining its position on competitive bidding of coal blocks and has marked coal blocks to be auctioned under different schedules (Schedule I to Schedule III). The Government plans to put up 91 coal blocks under the first round of bidding which is likely to start before the end of 2014 or early 2015. A total of 18,446 Million Tonnes (MT) of reserves, with an annual production capacity of 367 MT, is up for grabs. Through this auction, GOI intends to increase India’s coal output to more than 1 Billion Tonnes per annum by 2019. Ministry of Coal is likely to notify the bidding process by the last week of December and the whole process is expected to be completed by March 2015. W : www.bharatbook.com , T :  +91 22 27810772, 27810773, E :  info@bharatbook.com

  3. Salient Features • A combination of primary and secondary research has been undertaken to collate and analyze data / information. The data is collected from authentic sources and government websites • It is crosschecked and vetted by a pool of experts • A specially designed filter will enable users to select evaluation criteria according to their preferences / requirements. • The tool kit also offers advanced evaluation capabilities on seven critical parameters viz., W : www.bharatbook.com , T :  +91 22 27810772, 27810773, E :  info@bharatbook.com

  4. -Geological Characteristics with Seam Details and Disturbances -Mining Characteristics with Surface Constraints -Coal Evacuation Infrastructure Status of Clearances and Land Acquisition Type and Percentage of Forest Cover Habitation Details like Villages, Families and Project Affected People State Attractiveness Index • The tool also comes with a high degree of flexibility where in the users can custom design their risk perception based assignment of perceptive weights across each evaluation parameters. • The tool is a culmination of Athena Infonomics research on captive coal blocks and consistent efforts by a team of statisticians, economists, coal and power sector specialists.  W : www.bharatbook.com , T :  +91 22 27810772, 27810773, E :  info@bharatbook.com

  5. Table of Contents The following are some of the data points that are covered:1. Name of the coal block2. Location of coal blocka. Districtb. State3. Latitude /Longitude4. Coal Field5. Area of coal block6. End use of coal7. Approach to coal field8. Coal evacuation by nearest railhead W : www.bharatbook.com , T :  +91 22 27810772, 27810773, E :  info@bharatbook.com

  6. Continue… 9. Exploration Statusa. Fully Exploredb. Partial exploredc. Regional Explored10. Coal Seam Detailsa. Number of major seamsb. Seam Thickness11. Coal Quality ( Grade wise)12. Coal Reservesa. Geological Reserveb. Mineable Reserve13. Mine capacity 14. Type of mining W : www.bharatbook.com , T :  +91 22 27810772, 27810773, E :  info@bharatbook.com

  7. To view the full Executive Summary and Table of Contents, please visit: Captive Coal Block Assessment Toolkit Contact Us:-Call India: +91-22-27810772/73Email id : info@bharatbook.comWebsite : www.bharatbook.comOur Blog : https://www.bharatbook.com/blog/ Follow Us On :