National Conference on Agriculture for Rabi Campaign - 2010. DEPARTMENT OF AGRICULTURE & CANE DEVELOPMENT GOVERNMENT OF JHARKHAND. JHARKHAND STATE PROFILE. Area in % Area in Lakhs Ha * Total Geographical Area : 79.71 * Cultivable Land : 47.67% 38.00
E N D
National Conference on Agriculture for Rabi Campaign - 2010 DEPARTMENT OF AGRICULTURE & CANE DEVELOPMENT GOVERNMENT OF JHARKHAND
JHARKHAND STATE PROFILE Area in % Area in Lakhs Ha * Total Geographical Area : 79.71 * Cultivable Land : 47.67% 38.00 * Net Sown Area : 28.08% 22.38 * Current Fallow : 11.12% 8.87 * Other Fallow : 08.46% 6.74 * Forest : 29.20% 23.28 * Barren Lands : 7.20% 5.74 * Non – Agricultural Use : 8.60% 6.86 * Pasture and Other Grazing Land : 2.48% 1.97 * Cultivable Waste Land : 3.44% 2.74 * Miscellaneous Trees Grooves : 1.42% 1.13 * Irrigated land : 18% 6.82 * Cropping Intensity : 126%
Position of Agricultural Production & Productivity in the State of Jharkhand Unit Area on – 000ha, Production – 000 Productivity – kg/ha YEAR - 2001-02 YEAR - 2008-09
Area, Production & Productivity in the year 2009-10 Unit –Area –oooha, Production – 000MT Productivity - ha/ha Year 2009-10 The Kharif season 2009 was drought year. The Coverage of different crops in Kharif & Rabi is 16.81 lakh ha. Against the target of 27.67 lakh ha. The production is about 21.32 lakh MT.
Crop Coverage During Kharif, 2010 ( ‘000 ha) As on 15th Sept, 2010
Kharif Assessment – 2010 The Kharif season 2010 is drought affected year in the State of Jharkhand. The coverage of different crop is only 10.65 lakh ha (as on 31.08.2010) against the target of 24.67 lakh ha. The production is about 11.76 lakh MT is assessed in first advance estimate
Year Wise Seed Distribution by Govt. Schemes Qty in Qtl * Proposed Note : 55254 qtls seed distributed under Contingent Crop Scheme under Drought Condition
Crop wise Target area, production & productivity for Rabi 2010-11
Rabi Area and Projected Seed DistributionQty – Qtls, Area – ‘000 haRabi , 2010 * Seed Distribution is going on in Crop Contingent Plan
Requirement & Consumption of Fertilizer in Kharif 2010 as on 31-08-2010 Requirement of Fertilizer in Rabi 2010-11
REQUIREMENT RECEIPT AND SALE OF FERTILIZER DURING KHARIF 2010MONTH – SEPTEMBER SECOND WEEK (QTY. IN MT)
QUALITY CONTROL OF FERTILISER (i) Sample analyzed and found non-standard during 2009-10 (i) Sample analyzed and found non-standard during 2010-11 (31.08.2010)
STATEMENT SHOWING THE DEMAND VIS-À-VIS CONSUMPTION OF PESTICIDES DURING 2009-10 AND PROJECTED DEMAND FOR RABI, 2010-11 ( in MT) Dem.- Demand Cons.- Consumption
Rashtriyakrishivikasyojana(rkvy) Financial Achievement of CS/ CSS from 2007-08 to 2009-10 Rs. In Lakhs
FINANCIAL PROGRESS OF RKVY PROGRAMME (STREAM –I & II) DURING 2009-10 Rs. In Lakhs Note: Amount of State Assistance also included.
Special Emphasis under RKVY • 1497 Lift Irrigation schemes have been established till date under the programme and apart from this, 152 Lift Irrigations schemes have been established with the convergence of Water Structure created under NREGA, NWDPRA, Minor Irrigation and with other schemes. • 19 Seed farms is being strengthened in order to boost seed production. • 341 Birsa Pucca Check Dam & 341 LBCD have been developed. • 212 Farmers Field Schools have been conducted • Establishment of Automatic Weather Station at JSAC, Ranchi- Kharif Rice acreage estimation using satellite data and mapping of optimum agriculture land use plan of Jharkhand • Soil Nutrient Mapping at Block level for Dumka, Jamtara & Hazaribagh for Optimum Land Use Plan using GIS
Promotion of Farm Mechanization through Distribution of Agricultural Implement under 50% Subsidy during 2009-10
Vegetable Cultivation through Established Lift Irritation under RKVY in Bokaro District
Vegetable Cultivation through Established Lift Irritation under RKVY in Bokaro District
Support to state extension programme for extension reforms Financial Achievement from 2007-08 to 2009-10 ATMA Programme
Status of Implementation of State Extension Work Plan (SEWP) for 2009-10 A. State Level Activities Rs. In lakhs ATMA Programme
Status of Implementation of State Extension Work Plan (SEWP) for 2009-10 B. District Level Activities Rs. In lakhs ATMA Programme
Status of Implementation of State Extension Work Plan (SEWP) for 2009-10 B. District Level Activities Rs. In lakhs ATMA Programme
Status of Implementation of State Extension Work Plan (SEWP) for 2009-10 Rs. In lakhs Rs. 40.80 Lakhs unspent during the year 2008-09 has been utilized for Farm School. ATMA Programme
Approved State Extension Work Plan (SEWP) for 2010-11 Rs. In lakhs
Approved State Extension Work Plan (SEWP) for 2010-11 Rs. In lakhs