An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LARP MS mtg with LabReps, QXFcoords, L3s07/14/14 2nd draft of FY15 MS budget G. Ambrosio

  2. AGENDA G. Ambrosio • Report of 7/7 visit to DOE • New time/date for LARP MS mtgs • To be used also for mtgs w Lab Repr & L3s • Updated QXF plan • With 3 LQXFs and “delayed” 2nd SQXF • 2nd Draft of FY15 MS budget • Comments and next steps • AOB

  3. New Time/Date for these mtgs G. Ambrosio • Request to change date or start earlier • Is it OK if we start earlier on Mondays? • 60 min. earlier? (11am/1pm/2pm – LBNL/FNAL/BNL) • even earlier? • Otherwise Doodle with week of July 27 as typical week

  4. QXF Plan G. Ambrosio • 3 LQXF models • LQXF2 is back  300 Kg + 3/200 Kg conductor procurement in FY15 • SQXF2 coils fabrication postponed except one coil • possible mirror test in case of issues in SQXF1 coils • allows SQXF2 coil fabrication at slower pace

  5. SQXF plan FY15 SQXF mirror test SQXF1 test SQXF1b test SQXF2 test G. Ambrosio

  6. LQXF plan | CY15 | CY16 | CY17 | CY18 LQXF mirror test LQXF1 test LQXF1b test LQXF2 test LQXF3 test G. Ambrosio

  7. Priority 1 budget G. Ambrosio • In Priority 1 budget: • Same items as in previous version • Some small additional cuts • Added Strand procurement: 300 Kg • Added design of W&C infrastructure upgrade at BNL • Added long lead time items procurement for LQXF structure

  8. Priority 2 budget G. Ambrosio • In Priority 2 budget: • Strand procurement: 200 Kg (bare minimum?) • Procure equipment for Winding at BNL • Complete procurement ofLQXF structure

  9. FY15 MS Budget 2nd draft G. Ambrosio

  10. Backup Slides G. Ambrosio

  11. G. Ambrosio

  12. Goal of 1st draft G. Ambrosio • The goal of this draft is to have a first baseline for further negotiation/optimization at all levels • I think it shows that if the MS budget is < ~$10M the risk of not having a successful QXF demonstration is high • Note: in FY14 LARP MS + L3 total was