Explore the latest updates in Performance-Based Navigation (PBN) with the updated PBN Manual, advanced RNP specifications, and flight validation processes. Dive into PBN airspace concepts, operations manuals, and implementation toolkits for executives, regulators, ANSPs, and aircraft operators. Learn about improved criteria, Helicopter criteria, and collision risk models. Join workshops and training for ATC, pilots, and service providers to enhance PBN implementation globally.
E N D
EUR PBN TF PBN ICAO HQ Activities Overview
PBN - Where are we now? • Current PBN concept • Globally harmonized navigation specification based on existing national or regional requirement • Objective: facilitation of standardization with the aim to reduce cost, confusion and accelerate implementation
PBN - Where are we now? • Updated PBN Manual (Advance copy): • 1st week of July 2012 New Edition • PBN concept developments • Builds on existing requirements • Adds new specifications to address operational requirements • Curtails the proliferation of number of navigation specifications
PBN - Where are we now? • Updated PBN Manual - highlights • RNP 2 • High continuity (typically oceanic/remote applications) • Low continuity (typically continental applications) • RNP 0.3 • Intended for slow moving aircraft • Radius-to-fix (RF) (terminal and approach) • Fixed Radius Transitions (FRT) (en-route) • Advanced RNP (umbrella navigation specification) • High level ops approval guidance • Improved implementation process description
Advanced RNP A-RNP + options A-RNP Continental en-route: RNP 2,1 Final approach: RNP 0.3 RF legs Parallel offset RNAV holding RNP APCH RNAV 10 RNAV 5 RNAV 1 RNP 1 RNAV 2 RNP 4
Just Published Flight Validation
ATM / Airspace Planning and Design Support • Continuous Climb Operations (CCO) Manual • Advance copy by July 2012 • PBN Airspace Concepts Manual • Advance copy by July 2012 • ilearn information/workshop package on PBN airspace design • August 2012
Flight Operations Support • PBN Operations Approval Manual • Under review by PBN Operations Approval Tiger Team • Advance copy by September 2012 • ilearn information/workshop package on PBN Operations Approval • September 2012
PBN General • PBN Manual next edition • Advance copy July 2012 • ilearninformation/workshop package on PBN overview • September 2012 • Online PBN implementation status tool • September 2012
PBN General • PBN Implementation toolkit addressing: • Executives • Regulators • ANSPs • Aircraft operators • Manufacturers • September 2012
PBN General Instrument Flight Procedures (a summary) • Criteria to support new edition of PBN Manual • Improved Baro-VNAV criteria • Helicopter criteria • Sample charts • State Letter after IFPP/11 (December 2012)
PBN General (Planning) Planning • ilearninformation/workshop/training package on PBN for other domains • ATC • Pilots • Flight validation • Endorsement programme for service providers
PBN General (Planning) Planning • Collision Risk Model for PBN obstacle clearance and air-to-air separation • Combined effort IFPP and SASP • PBN Procedure Design Safety Assessment Manual • Advanced RNP support document
Objectives • New PBN documentation information • Status of global implementation • Identify implementation issues and problems • Development of a global action plan to support implementation • Plan to be presented to ANC/12 • Register at www.icao.int/meetings/pbn-symposium