Plans for ESTO Interim Review. AIST-QRS-06-0026 Title: The Detection and Tracking of Satellite Image Features Associated with Extreme Physical Events for Sensor Web Targeting Observing. Required Elements. Primary Findings, Technology Development Results and Technical Status
E N D
Plans for ESTO Interim Review AIST-QRS-06-0026 Title: The Detection and Tracking of Satellite Image Features Associated with Extreme Physical Events for Sensor Web Targeting Observing
Required Elements • Primary Findings, Technology Development Results and Technical Status • Results of tests and proof-of-concept demonstrations • Description of work planned for remainder of project • Critical issues • Cost and Schedule status • Schedule slippage/acceleration • Schedule milestone chart for major tasks • Cost data sheet • List total costs committed, obligated and costed • Graphical representation of projected and actual project expenditures
Optional Elements • Background info to orient reviewers • Photos, illustrations, diagrams pertaining to research • How we fit with other NASA work • Dependencies and how we manage them • NOAA cooperation and follow-on support • Journal/conference publications and presentations
Logistics • 1.5 hour (90 min) review implies ~30 slides • Slides must be uploaded 2 days before review (June 1st or latest by 4th ) • Images must be reduced to ~100dpi for display, then compressed to jpeg for upload • Will need to record actions from the review in order to update slides and upload to Interim Report in e-Books
Presentation Outline • Project Background and Introductions • Technical status • Identification of Enhanced-V and CI cases and test data • Data preparation and pre-processing • Source Investigations and findings • CLASS, GSFC GOES Project and McIDAS • Source metadata identification • Phase I data flow: McIDAS, WCS, Detector Application • Initial configuration • data tests and demonstration • Enhanced-V Algorithms • Inputs, matrix fabrication, cross-correlation form, initial tests • Detector filters, structure definitions, initial feature rankings • Work planned for remainder of project • Phase II data flow: NSSL, WCS, WFS, Demo Clients • Parallax correction for GOES, storm reports, analysis winds • System upgrade and processing/staging of case studies • Enhanced-V and CI Algorithm case study results • Journal publications, conference presentations • Event detection support for sensor-web development • Issues: GMU system security and SA support on-site at GSFC
Cost and Schedule Status • Milestone slippage: • Overall WCS Phase I data flow was delayed one month • To resolve issues with GOES data sources, projection and grid resolution • To decide content and form of GOES metadata input to WCS • Updated milestone schedule • Cost data sheet • Commitments to GMU, UofWisc, and NSSL • Graph of projected and actual costs • total by month