Restoring Environment- Maintaining Infrastructure; Tradeoffs for Long Term Sustainability

Restoring Environment- Maintaining Infrastructure; Tradeoffs for Long Term Sustainability Bob Stokes President Galveston Bay Foundation bstokes@galvbay.org (281) 332-3381. Do you know Galveston Bay?. Averages 7-feet deep 660 square miles of water

blake
Download Presentation

Restoring Environment- Maintaining Infrastructure; Tradeoffs for Long Term Sustainability

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Restoring Environment- Maintaining Infrastructure; Tradeoffs for Long Term Sustainability Bob Stokes President Galveston Bay Foundation bstokes@galvbay.org (281) 332-3381

  2. Do you know Galveston Bay? • Averages 7-feet deep • 660 square miles of water • 4 counties: Brazoria, Harris, Chambers, Galveston • 24,000 square mile watershed

  3. Galveston Bay Foundation Mission:To preserve, protect, and enhance the natural resources of Galveston Bay and its tributaries for present users and for posterity. Four target areas: • Advocacy • Conservation • Education • Research

  4. Galveston Bay InfrastructureIssues • Two Main Issues of Balance between Environment and Infrastructure • Massive Industrial Complex • Galveston Bay hosts nearly 1/2 of the total petrochemical manufacturing and 1/3 of the petroleum refining in the U.S. • Navigation Needs of that Complex • ~50 mile channel from Port of Houston to Gulf of Mexico

  5. Subsidence Caused by Groundwaterand Oil & Gas Extraction • Domestic and Industrial Water Needs • Highly Accelerated Rates of Subsidence • Loss of over 35,000 acres of wetlands • Recognition of Problem and Behavioral Change • More surface water, less groundwater

  6. Habitat Restoration • Identified as number one goal in Galveston Bay National Estuary Program Galveston Bay Plan

  7. GBF Habitat Restoration • Actively restoring habitat since 1991 • Diverse habitat types: wetland, sea grass, & reef • Working directly with local citizens for “community based” habitat restoration

  8. Burnet Bay Restoration Project Burnet Bay

  9. Burnet Bay Plantings with Support from Local Industry

  10. Galveston Bay Infrastructure:Major Navigation Channels Houston Ship Channel Gulf Intracoastal Waterway

  11. Houston Ship Channel • ~50 mile channel from Port of Houston to Gulf of Mexico • Much of the growth and development of the Houston area is attributable to its completion in 1914 • Ship channel-related businesses support more than 785,000 jobs throughout Texas while generating nearly $118 billion of statewide economic impact (Martin Associates, 2007).

  12. How to Balance NavigationNeeds and Environment? • Ultimate need for growth for capacity and safety • Impacts from a wider and deeper channel • How to mitigate those impacts?

  13. Houston-Galveston  Navigation Channels Beneficial Uses Group (“BUG”) • Coalition of 8 government agencies formed in 1990 to identify environmentally and economically responsible ways to utilize the dredged material • BUG project goals: • Create approximately 4,250 acres of intertidal salt marsh in Galveston Bay • Create a 6-acre bird nesting and habitat island • Partially restore Redfish Island in Galveston Bay • Restore Goat Island in Buffalo Bayou • Construct 118 acres of oyster reefs

  14. BUG Project: Evia Island • 6-acre island, one mile north of the Bolivar Peninsula built using materials dredged from the expansion of the Houston-Galveston Navigation Channels • Peak elevation of 12 feet above mean low tide, features a 250-foot beach and a lagoon area for young birds

  15. BUG Project: Bolivar Marsh • Several hundred acres of intertidal salt marsh adjacent to the north side of the Bolivar Peninsula • Levees constructed and shaped and erosion protection (geotubes) positioned • Two of the three cells filled with dredge material, third cell is partially filled and will be completed over the next 20 years • GBF and volunteers planted here at Marsh Mania 2001

  16. Gulf Intracoastal Waterway • Important navigation artery in Texas and along entire Gulf Coast • Erosion a significant problem along GIWW around Galveston Bay • How to address erosion and avoid negatively impacting waterway and shipping?

  17. Erosion Control Project on GIWW • Construct rock breakwaters along 34,700 feet of unprotected shoreline on the Anahuac NWR’s GIWW shoreline • Adjoins with East Bay Shoreline Protection Project, which recently completed 32,772 feet, or 6.21 miles, of rock breakwaters • Barge access and placement similar to recent work at McFaddin NWR