1 / 6

Alice ITS L5,6 Integration

Alice ITS L5,6 Integration. End wheels and local services design services layout on the end wheels: patch panels , routing , cooling and qualification End wheels design wrt services requirements Integration t ool design, production, procedures:

blaze
Download Presentation

Alice ITS L5,6 Integration

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Alice ITS L5,6 Integration • End wheels and local services design • services layout on the end wheels: patch panels, routing, coolingand qualification • End wheels design wrtservices requirements • Integration tool design, production, procedures: • Fixing features on wheels (pads, rubys): positioning, fixing • Staves handling • Staves insertion • Staves position measuring • Qualification • Half layer handling, half-L5 and L6 coupling • L5, L6 mockup(s) • Mechanicalintegration of L5,6 stavesatCern

  2. First models of integration tools Staves fixing features: single stave replacement capability

  3. Half layer / half barrel measurement: • Procedure for measuring the staves position wrt half-layer references • References for half layers / half barrel measurement wrtAlice reference system • Test of optical probe as available at Cern metrology

  4. Sezione di Padova Risorse di personale • End wheel services layout • 1st iteration of end-wheels and • services layout. • End-wheels: • staves insertion/maintenance • pigtails insertion/extraction • Layer/barrel stiffness Cern design

  5. Alice ITS L5,6 Integration - 2014 plan • Define integration tool design: fixing pad jig, stave integration • L5,6 half-barrel mock-up • Staves and wheels measurement strategies and tools • Services requirements, schematics and layout • Services assembly procedures and qualifications

  6. Alice ITS L5,6 Integration procedure • Fixing features on wheels (pads, rubys): positioning, fixing • Fix # pads/rubys to jig • Glue disposal • Mask positioning, • Reference jig measuring • Curing • Jigremoval and checks • Staves handling and insertion • stave shipping box/fixtures • Positioning on handling table • Acceptance tests • Fix to integration tool PINZE • Lift stave, positioning, checks, fixing, • tool removal, checks, • Services connections, fastening • Services joints qualification • Staves position measuring • Contact measures on stave ends • Optical measures as possivle • Half layer handling, half-L5 and L6 coupling

More Related