An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Clearwater-Aid Team: Eric Morris, Client Nick Mendenhall, Mechanical Engineer Whitney Menzel, Mechanical Engineer G Contreras, Mechanical Engineer Diana Rudeck, Biological Systems Engineer Mark Rogers, Biological Systems Engineer Matt Aldrich, Biological Systems Engineer

  2. Presentation Outline • Problem Statement • Objectives • Background Research • Final Design • Validation • Recommendation • Acknowledgements

  3. Problem Statement • 1 billion people live without access to improved drinking water (WHO). • Solving this problem for the Maasi tribe would be a step toward solving the world problem. • This is an engineering problem. Our team is looking for a solution to the problem.

  4. Objectives • A filtration system in which Maasai can take ownership. • Design, Build and Test a Slow Sand Filter. • Create an instruction manual to build a SSF. • Provide direction to assemble inexpensive water test kit. • Conduct Artemisia research to characterize Artemisian content in different species.

  5. Background Research • Darcy’s Law • Ceramic Filtration • Ceramic Manufacturing • UV light • Slow Sand Filtration • Kenya Research

  6. Background Research • Design Concepts: Ceramic Filtration Slow sand filtration UVC process

  7. Background Research • Concept Selection

  8. Final Design • Slow Sand Filter

  9. Final Design • Filter Specifications:

  10. Final Design • Test Kit Specifications:

  11. Final Design • Filtration Process

  12. Validation • Flow rate - 1. 66 L/min • Coliform - Absent • Bacteria Count - • Cost - 10 USD = 70KSH • Construction - < 1 Day • Schmutzdecke development time Three Weeks • Life • Sand = 5 years • Schmutzdecke – clean when flowrate drops

  13. Validation

  14. Validation

  15. Recommendations • The filter works and should be implemented.

  16. Eric Morris Don Blackketter Linda Morris Tom Hess Brad Beckman Don Elger Aicha Elshabini John VanGurpen Peter and Ole Acknowledgements

  17. Questions?