OPS Stress Corrosion Cracking Workshop

OPS Stress Corrosion Cracking Workshop. OPS Research and Development Projects James Merritt R&D Program Manager, Office of Pipeline Safety james.merritt@RSPA.DOT.GOV December 2, 2003. R&D efforts for SCC. Today’s Presenters Jerry Rau, Panhandle Energy

block
Download Presentation

OPS Stress Corrosion Cracking Workshop

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OPS Stress Corrosion Cracking Workshop OPS Research and Development Projects James Merritt R&D Program Manager, Office of Pipeline Safety james.merritt@RSPA.DOT.GOV December 2, 2003

  2. R&D efforts for SCC Today’s Presenters Jerry Rau, Panhandle Energy Ray Fessler, Biztek Consulting John Beavers, CC-Technologies, representing NACE Scott Thetford, GE, representing the In-line Inspection Association (ILIA) Todd Kedzie, El Paso Energy Corporation

  3. Where is SCC Technologytoday? • ILI technologies for detection of SCC in liquid pipelines exist • There are promising technologies for detection of SCC in • gas pipelines • The NACE SCCDA standard along with ASME B31 8S • Appendix A3 provide a framework for SCC threat management • Reliable in the ditch sizing has yet to be demonstrated to the • industry

  4. OPS GOAL OPS R&D effort stimulates economic activity, creates job opportunities and strengthens the industry’s competitive position in global markets. OPS will match one-for-one industry’s R&D contribution to collaborative research. This will stretch industry’s research dollar and ensure OPS research priorities accurately reflect the sector’s real needs. Speed up the process of transferring new technology into the private sector.

  5. Recent R&D Projects Map

  6. R&D Management Process-Planned Enhancements • Annual R&D Forum to Support Issue Identification and Priority Setting (Dec 11,12) • Publication of Integrated R&D Procurement Plan for Federal Agencies (due to Congress by 12/15) • Joint Agency Solicitations (Biannually) • Communication of R&D Results and Implications (Technology Transfer) • Collaborative Interagency Technology Development/Demonstration (ongoing)

  7. Where to LocateAdditional Information http://primis.rspa.dot.gov/matrix

  8. Summary • Research has been active and productive in the area of • SCC since mid 1960s • R&D gap analysis identifies needs in: • Modeling development and validation • Refinement of growth models for establishing • re-inspection intervals • ILI for gas pipelines • Accurate NDE sizing –both ILI and in the ditch • Practical ECA tool(s)

  9. How can you contact OPS? Jim Merritt James.Merritt@rspa.dot.gov 303-683-3117 Jeff Wiese Jeff.Wiese@rspa.dot.gov 202-366-2036