An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Intro to Manufacturing Lean Tools 1 Order Point Calculation Order Point = (LT x Avg) + (StdDev x ServFactor) LT = Lead time to replenish shelf Avg = Average demand per period (typically per week) StdDev = Standard deviation in the demand per period (this measures how variable the demand is compared to the average) ServFactor = Service Factor per table below (what percentage of the time should a customer be able to get the desired quantity from the shelf) Service Level Service Factor 84.0% 1.0 93.5% 1.5 97.5% 2.0 99.3% 2.5 99.8% 3.0

More Related