An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Goshen Webelos Program Strategic Plan Todd Skiles – dtoddskiles@gmail.com

  2. Program Expansion for Webelos • Webelos Camps are the single most popular program at Goshen. • They sell out each year. • Key to long-term retention and growth. • Existing Program Gear is showing age. • “ ‘yaks have cracks” • Proposal Assumes: • Maintaining current camps. • Same approach at both camps allowing for customization by staff.

  3. Recommendations • Tier 1 Level – Purchases with focus on long-term maintenance. • Tier 2 Level – Construction Projects • Tier 3 Level – Managerial and Service

  4. Tier 1 – Purchases • 2013 • Telescopes - $4,000 • 2 Dobsonian and 2 Refractors each per camp. (8 total) • Compound Bows - $2,500 (10 per camp) • Kayaks, 10 per camp - $9,000 • Tools for both camps - $4000 • 2014 • Rowboats with oars/locks - $5,000 (phase 1) • 2015 • Return of “The Blob” - $13,000* • Rowboats Phase 2 - $5,000* *Dependency on Tier 2 Construction

  5. Tier 2 Examples

  6. Tier 2 – Construction* • 2013 – Not Feasible • Expand PMI Parking - $4000 • 2014 • Expanded Aquatic Frontage - $75,000 • Theme Area Construction (the “set”) - $60,000 • Additional field areas - $45,000 • Exhanced Shooting Pavilions – Archery - $50,000 2015 • Second Dock - $30,000 • Additional Pavilions (4 total, 2 powered) - $150,000 • Expanded Shooting Pavilions – BBs - $50,000 *rough estimates only – needs better cost analysis

  7. Tier 2 – Construction Notes • 2013 – can a slight mod be made with the team building the spillway to clear additional space at PMI for parking? • Ross needs a permanent archery facility rather than just canopies.

  8. Tier 2 – Construction Notes • Recommend one electrified pavilion at both PMI and Ross to support Nature. • Could include aquariums, cold storage for bait, etc. • Convert existing Nature Pavilion at Ross to other program. • Existing PMI Pavilion could be modified. • Consider Nature next to lake to support fishing program and use the secondary docks proposed.

  9. Tier 2 - Examples

  10. Tier 3 - Managerial • 2013 • Expand waste management contract to include recycling – approx $500 per camp for the season. • Discretionary Income for Camp Staff – improve flexibility to address program needs. $500 per year per camp to start. • 2014 • Expand camp to 7 weeks • Or build a third Webelos Camp • Additional weeks bring in additional revenue • Partnership programs reach whole new sources of revenue and promote staff opportunities

  11. Summary Cost Breakdown

  12. Program Support for Facilities • Better alarm system for both camps – not electrical. • Improved electrical system at Showerhouses • Improved drainage within Showerhouses • Improved electrical systems in Staff Site • Laundry Facilities at PMI • Repairs and better structure behind PMI campfire site