1 / 16

Rail Feedback

Rail Feedback. Projects: Grapefruit Project – Japan Letsitele / Hoedspruit / Malelane to Durban Valencia Project Letsitele and Polokwane Hub ( Zebediela / Limpopo River / Zimbabwe) to Durban Russia consolidation FPT / 333 Logistics / MFT Polokwane Hub Project

bobby
Download Presentation

Rail Feedback

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Rail Feedback Projects: • Grapefruit Project – Japan • Letsitele / Hoedspruit / Malelane to Durban • Valencia Project • Letsitele and Polokwane Hub (Zebediela / Limpopo River / Zimbabwe) to Durban • Russia consolidation • FPT / 333 Logistics / MFT • Polokwane Hub Project • Containers to DCT Letsitele / Zebediela / Limpopo River / Zimbabwe • Break-bulk from Zebediela / Limpopo River / Zimbabwe

  2. Northern Region Grouping

  3. Northern Region Grapefruit Production Overview

  4. Northern Region Grapefruit Rail Volume Overview Letsitele / Hoedspruit / Malelane to Durban 50% GF Production for Japan & other markets

  5. Northern Region Valencia Production Overview

  6. Northern Region Valencia Rail Volume Overview

  7. Northern Region Total Rail Volume Overview Service 2 20% of citrus volume to Durban = 5,500 road trucks

  8. Northern Region Break-bulk Rail Overview Valencia 2 Wk 25 - 36 Grapefruit 1 Wk 17 - 25 • Grapefruit Rail Service 1 Wk 17 – 25 • Valencia Rail Service 2 Wk 26 – 36

  9. Durban Port Rail Siding Overview

  10. Break-bulk Rail Summary • Costs • Rail costs are higher than necessary due to rail being facilitated by 3rd parties. • If growing regions consolidated rail efforts and managed a rail account directly with TFR they could reduce transport costs significantly. • Alternatively CGA rail account • Service • Rail to Durban only works well to FPT, 333 Logistics and MFT facilities. Other facilities are too far out. • Japan and Russia volume considered ‘rail niche’ cargo. Homogeneous and single receiving facility. • Grapefruit rail service 1: Letsitele, Hoedspruit and Malelane to 333 Logistics. • Valencia rail service 2: Letsitele and Polokwane Hub to FPT, 333Logistics and MFT. • Russia consolidation from Letsitele and Polokwane Hub to FPT. • All Russia fruit is consolidated from multiple packhouses and railed to FPT.

  11. Break-bulk Rail Cost vs. Road

  12. Northern Region Container Rail via Polokwane Overview

  13. Northern Region Container Rail via Polokwane Overview • Operational Benefits: • Exporter can consolidate from multiple suppliers – not restricted to a single supplier. • Accessible to the greater northern Limpopo and Zimbabwe regions. • Better equipment and better efficiency can be achieved. • EU EN 24hr rule will hinder the current Letsitele train as shipping lines will not release empty containers without a booking reference. • Citrus can be accumulated and bookings done based on stock. • Container loading and break-bulk done from the same facility. • Where are we? • Addressed with TFR and plan meetings with Limpopo Dept. Of Roads and Transport. • Steering committee to oversee logistics tender process.

  14. Northern Region Valencia Production Volume Overview

  15. Polokwane Hub Container Rail Cost

More Related