1 / 16

Presented by Executive Director of Facilities Management Chuck Scott

Presented by Executive Director of Facilities Management Chuck Scott. Support Educating Illinois Maintain physical environment for the delivery of education Safe, functional, aesthetically pleasing, environmentally sensitive Recruitment and Retention.

bonner
Download Presentation

Presented by Executive Director of Facilities Management Chuck Scott

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presented by Executive Director of Facilities Management Chuck Scott

  2. Support Educating Illinois Maintain physical environment for the delivery of education Safe, functional, aesthetically pleasing, environmentally sensitive Recruitment and Retention Facilities Management Mission

  3. Quad(Top Left) Performing Arts Center (Top Right) Fell Hall (Bottom Left)

  4. The History of Facilities Growth at Illinois State University 6,000,000 5,000,000 4,000,000 Gross Square Feet 3,000,000 2,000,000 1,000,000 0 1909 1915 1926 1939 1951 1955 1957 1960 1963 1965 1967 1970 1976 1982 1989 1997 2000 Year

  5. 1957-1977: 600,000 gsf to 2,400,000 gsf equals 390% increase in GR gsf BR space approximately same rate of growth Total campus now at 6,735,385 gsf Capital Replacement Value estimated at $1.2 Billion Campus Growth

  6. National average for maintenance is 2-3% of CRV ($24M) 2003 DM backlog $490,577,434 ISU has expended $99.7M in DM since 2003 (approximately $14M per year) Walker, Dunn, Barton $24,000,000 McCormick $8,777,000 Watterson Commons $2,000,000 Building Cost Index adds 4-5% annually 2010 DM backlog $532,240,578 Campus Growth Cont.

  7. Schroeder Deteriorated Insulation

  8. Linkins Rusted Cooling Tower

  9. Metcalf Rusted Junction Box

  10. Facilities Condition Assessment (FCA) Similar to a home inspection of all building systems Facilities Condition Index (FCI) Deficiency value of a building calculated by dividing the estimated cost of current deficiencies by the replacement value and is expressed as a percentage. National standards suggest that buildings with an FCI greater than 10% are in poor condition. In 2003, ISU FCI ranged from 1.46% to 72.78% with an aggregate of 44.68% Deferred Maintenance

  11. Total Space by Condition

  12. Developed to manage the deferred maintenance backlog by identifying current and future projects Facilities Maintenance Plan (FMP) www2.fac.ilstu.edu/fmp/

  13. Long Term solution is multi-faceted and comprehensive Continued focus on building envelopes, life/safety, code compliance Roofs, windows, doors, tuck pointing, fall protection, fire alarm and protection systems…not visible repairs as they are within the basements and mechanical rooms Plan for projects that support themes identified by responses in the public master planning forums Sustainability, energy conservation, alternative transportation, green space, electronic access, green standards in design guidelines, accessibility, pedestrian and vehicular circulation, parking lot maintenance and space allocation, and sensitivity to neighbors and the community Safe, functional, aesthetically pleasing, environmentally sensitive Priorities and Pressing Issues

  14. Milner Info Commons, Williams, College of Education, College of Nursing Electrical Substation Replacements at U-High, Horton, Fell Elevator rehabilitation in Bone, Williams, Centennial East Campus-wide emergency generator testing, fall protection systems, tuck pointing, roof repairs, and concrete repairs Electronic access for prioritized buildings and rooms Capen Auditorium, routine painting and dry erase board replacements Specific Projects

More Related