1 / 8

Target Review

Target Review. M. Sponar DG Environment, Unit C2. Roadmap on Resource Efficiency. Adopted in September 2011 2020 aspirational objectives Full implementation of the EU waste acquis Waste generation per capita in decline

bpreston
Download Presentation

Target Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Target Review M. Sponar DG Environment, Unit C2

  2. Roadmap on Resource Efficiency Adopted in September 2011 2020 aspirational objectives • Full implementation of the EU waste acquis • Waste generation per capita in decline • Recycling and reuse are economically attractive and at 'max feasible level' • Energy recovery limited to non-recyclable materials • Landfilling virtually eliminated

  3. 7th EAP • Adopted by the Commission by December 2012 • Based on the RE Roadmap principles and targets • Additional focus on hazardous waste • Effective use of market based instruments • Measures to improve eco design Currently discussed in the Council and Parliament, final adoption in 2013

  4. Target Review • Objective 'translate' Roadmap and 7th EAP aspirational targets into legislation • Method "two phases" (scoping, in-depth assessment), supporting contract • ScopeReview clauses in 3 Directives (Landfill, WFD and Packaging) • Timing Proposal by 2014 – stakeholder consultation in 2013 – IA in 2014

  5. Issues • Statistics & Calculation methods &Simplification • Waste Hierarchy • Targets • Reinforced targets • New targets for new waste streams • Use of economic instruments • Planning

  6. Source: Eurostat 2012 Source: Eurostat 2012

  7. Related initiatives • Supporting contract : Signed on 7/12/2012, 14 months: 7/2/2014 • Modelling • EPR guidance • Ex-post evaluation

  8. Thank you for your attention ! • Additional sources of information: • DG ENV “waste” website: http://ec.europa.eu/environment//waste/index.htm • Resource Efficiency: http://ec.europa.eu/resource-efficient-europe/index_en.htm • Eurostat Databases: http://epp.eurostat.ec.europa.eu/portal/page/portal/waste/introduction • Study on economic instruments: http://ec.europa.eu/environment/waste/use.htm • EEA: http://www.eea.europa.eu/themes/waste • Michel.Sponar@ec.europa.eu

More Related