310 likes | 508 Views
ПОЛЕЗНИ ПРАКТИКИ ЗА УСПЕХ В 7-ма РАМКОВА ПРОГРАМА Владимир Кожухаров , NMP-NCP Химикотехнологичен и Металургичен Университет (ХТМУ) - ЛАМАР Информационен ден : Нано-науки, нанотехнологии, материали и нови производствени технологии гр. Пловдив, 23 Февруари 2007.
E N D
ПОЛЕЗНИ ПРАКТИКИ ЗА УСПЕХ В 7-ма РАМКОВА ПРОГРАМАВладимир Кожухаров, NMP-NCPХимикотехнологичен и Металургичен Университет (ХТМУ) - ЛАМАРИнформационен ден: Нано-науки, нанотехнологии, материали и нови производствени технологиигр. Пловдив, 23 Февруари 2007
21 DEC 06 - Work Programmes (5) adopted 22 DEC 06 - First calls (42) issued (11ч.) FP7 Decisions http://cordis.europa.eu/en/home.htm
FP7 (2007–2013) Specific Programmes 1 Cooperation – Collaborative research Ideas – Frontier Research People – Human Potential Capacities – Research Capacity + JRC (non-nuclear) JRC (nuclear) Euratom
Some statistics FP6 budget(in billion €, total ≈27)
FP7 budget(in billion €, total 50.521) Collaborative research (Collaborative projects; Networks of Excellence; Coordination/support actions)
1 FP7 –SP Cooperation 10 Themes (€ million) * Not including non-nuclear activities of the Joint Research Centre: €1 751 million
Collaborative projects consortia with participants from different countries new knowledge, technology, products or common resources for research size, scope and internal organisation of projects can vary Networks of Excellence 3.Coordination and support actions Support to frontier research 5.Training and career development of researchers 6. Research for the benefit of specific groups (in particular SMEs) Funding Schemes
Research and technological activities: up to 50% of eligible costs, except for: Public bodies: up to 75% Secondary and higher education establishments: up to 75% Research organisations (non-profit): up to 75% SMEs: up to 75% Demonstration activities: up to 50% Other activities: up to 100%, e.g. Management Coordination and support actions: up to 100% Maximum Funding Rates
“Contract” becomes “Grant Agreement” “Contractor” becomes “Beneficiary” “Instruments” become “Funding Schemes” “Audit certificate” becomes “Certificate on Financial Statement” “Pre-existing know-how” becomes“Background” “Knowledge” becomes“Foreground” Simplification of procedures New Terminology
Instead: establishment of a participant guarantee fund to cover risks No financial collective responsibility, unlike FP6 Similarities of GA with FP6 contract • Core part: GA parameters, • Annex I: DoW, Annex II: Gen.Conditions, • Annex III: Specific provisions for funding schemes • Annex IV, V & VI:Form A,B & C (electronically) • Annex VII:Form D terms of reference for the certificate of costs and Form E certificate on the methodology (NEW). • Consortium Agreement mandatory.
Overall objective: To improve the competitiveness of EU industry (including SMEs) and ensure its transformation. Useful Practices A 1 2 3 4 B 4Y Project C A- Exact estimation for NMP- theme allocation Local resources & infrastructure for research Coordinator, consortium building and funding Proposal preparation and sending procedure Evaluation procedure
Exact estimation for NMP- theme allocation main features Theme 4: NMP- • NMP addresses all industrial sectors • Stimulates strong participation of SMEs • Promotes a multi- disciplinary approach • Favours cooperationacross the supply chain • Two stage proposal submission (except CSA) • Budget allocation by call (not by Activity/Area) • Yearly updated workprogramme
Four activities: Nanosciences and nanotechnologies Materials New production Integration of technologies for industrial applications Exact estimation for NMP- theme allocation Theme 4:NMP
Activity 4.1: Nano S&T 4.1.1: Nanosciences and converging sciences 4.1.2: Nanotechnologies and converging technologies 4.1.3: Health, Safety and Environmental Impacts WP - NMP Activity 4.2: Materials 4.2.1: Mastering nano-scale complexity in materials 4.2.2: Knowledge-based smart materials with tailored properties 4.2.3:Novel biomaterials and bioinspired materials 4.2.4: Advances in chemical technologies and materials processing 4.2.5: Using engineering to develop high performance materials
Activity 4.3: New Production 4.3.1: Development and validation of new industrial models and strategies 4.3.2: Adaptive production systems 4.3.3: Networked production 4.3.4: Rapid transfer and integration of new technologies into the design and operation of manufacturing processes 4.3.5: Exploitation of the convergence of technologies WP - NMP Activity 4.4: Integration of technologies for industrial applications 4.4.1:Advanced wood-based composites and their production - LSIP 4.4.2:Application of new materials including bio-based fibres in high-added value textile products – SME-TP 4.4.3.Multifunctional materials for the future vehicles – LSIP 4.4.4:Development of nanotechnology-based systems for in-vivo diagnosis and therapy – LSIP
КЪДЕ ДА СЕ УЧАСТВА ? Genome Photonic Holey Fiber BOTTOM-UP SYNTHESIS The tiny revolution TOP - DOWN PROCESSING
BG local FP7 network (viko@uctm.edu) HES IND HES IND SME IND NCP UNI OTH ROR NCP EC/FP7 NCP HES OTH IND NCP ROR HES HES NCP OTH IND IND COOREERS NMP-NCP coordination action MES www.nsfb.net Networking 2 EUROPEAN NCP contacts exists
Local resources and infrastructure for research Templates: > Project - Partner search form > WEB site, > CV > Org. Description, R&D activities, Expertise, > Lab,s Facilities ( reflecting for WP preparation)
6 VALIDATION \ EXPERT SYSTEMS 3 2 PROPERTIES SYNTHESIS IT - SOFC PERFORMANCE 1 4 5 MODELING • PHYSICAL • CHEMICAL STRUCTURE NANO MATERIALS
1 - SYNTHESIS ( METHODS ) G (Gas) MIX L (Liquid) Shock wave ENVIRONMENTAL S (Solid) High pressure Sol-Gel + Spray Solvothermal P (atm) Solid State Reactions 1 atm. Hydrothermal Fusion C V D LASER Gasflame Ion ATTRACTIVE Electron Sputtering PLASMA V. Evaporation SOFC t , °C 0 1 2 3 x 1000 Deposition of thin-film electrolyte and nano- structured electrodes by combustion CVD, sol-gel, slurry coating & templateing synthesis methods are actual at present.
3 - CHARACTERIZATION ( PROPERTIES ) THERMAL PROPERTIES PHYSICAL & CHEMICAL • -T.EXPANSION, CONDUCTIVITY etc. ELECTRICAL & MAGNETIC PROPERTIES THECHNIQUES FOR • -E. CONDUCTIVITY, TRANSPORT BEHAVIOUR, DIELECTRIC etc. MECHANICAL PROPERTIES PHYSICOCHEMICAL CHARACTERIZATION • -ELASTICITY, ADHESION,CRACK PROPAGATION etc. SURFACE & INTERFACIAL PHENOMENA • - SURFACE TENSION & CAPILLARITY, TPB etc. OTHER (COMPLEX) PROPERTIES STANDARDS
Coordinator, consortium building and funding University, SME, Research Organization, Other unit Coordinator Consortium building Small, Middle, Large Small or medium scale focussed projects < € 4 million Large scale integrating projects > € 4 million Funding scheme
INM EURICE IPA EADS LLI FEM ELAS TNO TUS UNIMAN SEI ICF BUH INASMET ICV UCTM NCSR HAI ISQ AVEIRO GENTACASTI CRF UDINE CSM PLALAM CROMOSPHER MULTIPROTECT 30 partners ISRAEL IIM SHL/IAI ALUBIN 13 countries
NMP3-CT-2005-011783 MULTIPROTECT WP 1 - 7 STRUCTURE , INTEGRATION & WP Leaders LAMAR PARTNERS 1 - 31 IP- MULTIPROTECT INM & EURICE WP1 GENTA&TIPO WP2 INM WP3 IPA & IIM WP4 EADS WP5 CASTI WP6 UDINE & EURUCE WP7 UCTM Supported by the European Commission under the 6th Framework Programme
Deadlines of the Calls Collaborative projects Closure date of First Stage: 4 MAY 07 10 page proposal:S&T content + expected impact 2 pages: consortium+estimated financial resources Indicative closure for Second Stage SSFRP on 13 SEP 07 LSIP, SME-TP on 4 OCT 07 Coordination and Support actions Closure date: 5 JUN 07 – Single stagе WP - NMP
Proposal submission Using the Electronic Proposal Submission Service (EPSS) Proposals arriving by any other means are regarded as ‘not submitted’. Advice: Submit first a draft version one week before the deadline WP - NMP 1
Submission and evaluation in FP7 1 Proposal Eligibility A 10 page proposal:S&T content + expected impact 2 pages:consortium+estimated financial resources Individual evaluation 100% Consensus Security Scrutiny (if needed) 2 Thresholds 20% Applicants informed of results of expert evaluation* Panel review with hearing (optional) Ethical Review (if needed) Commission ranking • invitation to submit second-stage • proposal, when applicable Negotiation 3 Commission rejection decision Consultation of programme committee (if required) Applicants informed of Commission decision 50% Commission funding and/or rejection decision
Evaluation criteria and thresholds S&T quality 4/5 Implementation 3/5 Impact 3/5 Overall 12/15 Implementation is not considered in stage 1 and the overall threshold is 8 For LSIP, in stage 2 the threshold for Impact is 4 WP - NMP 2 4/5 4/5 8/10
FP7 Information • EU research: http://europa.eu.int/comm/research • Research programmes and projects: http://cordis.europa.eu/fp7/ • BG Info centre http://www.nsfb.net Additional country- specific information: http://7fp.nsfb.net
Instead of CONCLUSION Be active Be acurate and correct Show knowledge Show quality Be flexible Be open 6 FOR YOUR SUCCESS
БЛАГОДАРЯ ЗА ВАШЕТО ВНИМАНИЕ