1 / 16

Status Reports (STF 213, MTS-IPT, STF 236) and Info (STF 219, STF 224)

Status Reports (STF 213, MTS-IPT, STF 236) and Info (STF 219, STF 224). Anthony Wiles MTS#36 Budapest, March 2003. STF 213 TTCN-3 Edition 2. STF 213 Closed December 2002 On time, on budget Parts 1 - 5 v2.2.1 now published PTCC web updated as requested by MTS#35

brendakelly
Download Presentation

Status Reports (STF 213, MTS-IPT, STF 236) and Info (STF 219, STF 224)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status Reports(STF 213, MTS-IPT, STF 236)and Info(STF 219, STF 224) Anthony Wiles MTS#36 Budapest, March 2003

  2. STF 213TTCN-3 Edition 2 • STF 213 Closed December 2002 • On time, on budget • Parts 1 - 5 v2.2.1 now published • PTCC web updated as requested by MTS#35 • Part 6 (TCI) to be approved at this meeting (Ina) • CR process being managed on an 'emergency' basis • All CRs, status (28.02.03), living list etc. on PTCC website • Need to discuss new STF - June 2003 (?) and 2004 • When do we decide to hav next revision (2.3.1, 3.1.1)? • Training material (approval): Gyorgy (voluntary work) • New Rapporteur (Gyorgy/Sarolta?) • TTCN-3 promotion activities? MTS#36, Budapest, March 2003

  3. EP TIPHON (DTS/00065-1,2,3 R4) STF 213 and STF 224 • STF 224: Generic approach to interoperability testing • Methodology • Terminology • Abstract test architectures (general model which resolves to special cases) • Test development process (using simple UML) • Testing process (also in UML) • Assumes conformance testing been done previously • Installed an experimental SIP-H.323 test bed at ETSI • Voluntary equipment from various vendors • Gatekeepers, Gateways, IWF, SIP/H.323 terminals etc. • STF 219: H.323-SIP Interoperability Test Scenarios • Several hundred test cases; • Now being aligned with the methodology (validated on test bed) MTS#36, Budapest, March 2003

  4. MTS-IPT (General) • Kick-off meeting held in October 2002 • MTS ToR approved by Board to include these activities • Info/News/Press release • http://www.etsi.org/ptcc/ptccIPT.htm • 1-page status input to Board#42 (MTS 36TD16) • Two main activities • SIGTRAN • IPv6 MTS#36, Budapest, March 2003

  5. MTS-IPT (SIGTRAN) • Lot of interest in SIGTRAN test specifications • 8 active voluntary participants (8 companies) • Representatives from MTS, SPAN and IETF • Plus 4 observers and 1 uncommitted (3 companies) • Concentrating on M3UA and SCTP • Have draft TPs (for both) • Must align with SPAN's subset for SIGTRAN • Hope to go to TTCN-3 for ATS • Should open WI's as needed. Need 2 WIs now: • TSS&TP for M3UA (main driver GN Nettest now Navtelcom) • TSS&TP for SCTP (main driver TestingTech) • Workplan needs to be drawn up • STF not needed - all homework (coordinated by PTCC) MTS#36, Budapest, March 2003

  6. MTS-IPT (IPv6)STF 236 • STF 236 started work in January • Anthony Wiles (PTCC), Scott Moseley • César Olivera, César Viho (voluntary), Frédéric Roudaut • Max Frey (including 5 days voluntary) • Steve Randall (3 days - in April for review) • 75 of 87 days used with 4 days not yet assigned • Major milestones • 14 March: 1st Draft (OK) • 1st Progress Report TD12 • Mid April: 1st proposal to EC • EC have changed date to end of April • 25 April: TB approval • request slight delay (start process end of April or even mid-May) MTS#36, Budapest, March 2003

  7. STF 236Identified Work Packages • Identified 7 Work packages • WP1: Toolbox and Core • WP2: Transitioning • WP3: Mobility • WP4: IPSec • WP5: QoS • WP6: Routing • WP7: Multicast • Based on areas of common interest to • EC eEurope / European industry / ETSI members • 3GPP (mid/end 2004) • ETSI NGN (late 2004) • IPv6 Forum certification scheme (2004) MTS#36, Budapest, March 2003

  8. STF 236Contents • Introduction/background • Interested players: IETF, EC, 3GPP, ETSI TBs, IPv6 Forum etc. • Basic concepts • Description of each workpackage • 1st shot at resource estimate (need to revise) • In region of 270 man-months total (!) • Can PIck-'n-Mix • Lot of data! see annexes: • Tables, data, lists of RFCs, 3GPP, priorities, existing test suites etc. for each package • Proposal for eEurope 2005 - to do • ToR etc. for individual STFs not done (suggest to wait) MTS#36, Budapest, March 2003

  9. STF 236Basic Concepts • Toolbox is a key concept • TTCN-3 toolkit • Max will talk about this • Core IPv6 protocol • Other test suites based on toolbox • Core part • Specific part • Savings • Good SW engineering approach • 20% per test suite • Easier maintenance • Adaptability/Extensibility (3GPP, SMEs, NGN etc.) MTS#36, Budapest, March 2003

  10. STF 236Basic Tasks - Core (9.2.3) • Methodology • Toolbox • Core protocol mechanisms • Patterns • Switches • User guide • Integration of TTCN-2/3 • Core protocol test suite (conformance/IoP) • Needed? Already out there with TAHI, UNH etc. • But we need enough on which to build other WP test suites MTS#36, Budapest, March 2003

  11. STF 236Basic Tasks - Other Packages • Specification of Minimum Requirements • Minimum RFCs • Minimum reqs - like PICS • Definition of Test Architecture and Methods • Engineering approach • Use of toolbox • TPs (Reuse?) • Test Suites • Both Conformance and Interop test specifications • Reusibility (IoP assumes test specs already exist) • Validation (voluntary?) MTS#36, Budapest, March 2003

  12. STF 236Tool Support • TTCN-3 will be used • Both for Conformance and Interop tests • In IPv6 Forum the IoP tests are automated • Existence of tool support will be essential • Additional package? • Voluntary? • Other project (e.g., IST6 TIPI)? MTS#36, Budapest, March 2003

  13. STF 236Timelines • Funding from EU not likely before Sept/October 2003 • No funding from ETSI likely in 2003 • If we wish to start earlier • Will need to be on a voluntary basis • Work anticipated to span 2004 - 2006 MTS#36, Budapest, March 2003

  14. STF 236 Cost sharing issues • The commission only funds 50% • ETSI STF budget (FWP/PTCC) is not large • Will require some voluntary activity • Other projects • TIPI (but also only 50%) • May be possibility for 100% but the situation is unclear MTS#36, Budapest, March 2003

  15. STF 236What next - short term • Week 14 - 16 • Anthony finish TR • Use of English etc. needs a thorough rationalisation (AW) • Draft proposal for EC if possible • Week 17 • Anthony, Steve, Scott • Need decision from MTS on which packages and where to place them (which projects)!! • Finalise proposal for EC • 3-4 pages to Gavin for the Commission • ToRs for phase 1 packages (?) • Approval of TR can begin after that (from week 18) MTS#36, Budapest, March 2003

  16. STF 236What next - longer term • Anthony (PTCC) can continue with proposal • But not alone! • Need support from MTS • Full technical annex • Based on data from the TR • Partners!!! • Resource plan (voluntary vs. funded) • etc. • Completed by September? MTS#36, Budapest, March 2003