70 likes | 197 Views
Adherence to WECC Regional Criterion. Steve Ashbaker December 10, 2009 WECC GNC. Determine Criterion to monitor. Need to define the criterion that will be monitored and the applicable entities Currently 16 Regional Criteria (BPs)
E N D
Adherence to WECC Regional Criterion Steve Ashbaker December 10, 2009 WECC GNC
Determine Criterion to monitor • Need to define the criterion that will be monitored and the applicable entities • Currently 16 Regional Criteria (BPs) • Operating Reliability Work Group reviewing current MORC as part of Document Categorization (several sections moved to Regional Standards; some criterion will remain)
Determine Criterion to monitor • Voltage Ride Through Criterion • Reliability Data Exchange Criterion • System Performance Criterion (TPL-001-004)
Process for monitoring Adherence to WECC Regional Criteria • Options to consider for monitoring adherence to WECC Criterion • Self Certification Reports from Applicable Entities (Honor System) • Develop a selection process for validation/spot review of Self Certification information • Site visits by WECC Staff or Regional Organization (OPS)
Process for monitoring Adherence to WECC Regional Criteria • Table Top Monitoring of WECC Criterion • Next Steps • Determine process for monitoring • Determine levels of non-adherence • Follow up/tracking of non-adherence • Staffing requirements
Process for monitoring Adherence to WECC Regional Criteria • How often do we monitor adherence (annually; every three years, etc) • Cost to implement Monitoring Program
QUESTIONS ----------------------- Thanks