160 likes | 266 Views
Michigan Highway Construction: Traffic Tangles . Feb. 10 th 2006 By: Matt Helms, FreePress Columnist . Who’s Effected?. About 648,000+ travelers per day If you travel: I-696 and Northwestern Hwy 335,000 M-14 80,000 I-75 80,000 I-96 153,000 Southfield Freeway. Delays = Problems!.
E N D
Michigan Highway Construction: Traffic Tangles Feb. 10th 2006 By: Matt Helms, FreePress Columnist
Who’s Effected? • About 648,000+ travelers per day • If you travel: • I-696 and Northwestern Hwy 335,000 • M-14 80,000 • I-75 80,000 • I-96 153,000 • Southfield Freeway
Delays = Problems! • Delays cause problems • Value of Time • Lost Wages • Lost Business Income Lengthy trips means less people want to travel
Vehicles Area of Highway (sq. mile)
Vehicles Area of Highway (sq. mile)
Vehicles Area of Highway (sq. mile)
Vehicles S D Area of Highway (sq. mile)
Construction takes over the road! Vehicles S D Area of Highway (sq. mile)
Smaller roads mean more congestion Vehicles S D Area of Highway (sq. mile)
Good or Bad? • Construction means better roads in the future • Construction means longer travel times now • Does a little traffic congestion now mean easier driving later?
Vehicles S Potentially larger roads in the future is less traffic congestion D Area of Highway (sq. mile)
Notables • Detroit Free Press • Reed Saxon photo