Progress Briefing to Campus Groups SPAC March 12, 2009. Campus Master Plan Update. What is the Campus Master Plan? Supports the goals, strategies and initiatives of the NAU Strategic Plan Vision for the physical development of NAU’s Mountain Campus
E N D
Progress Briefing to Campus GroupsSPACMarch 12, 2009 Campus Master Plan Update
What is the Campus Master Plan? Supports the goals, strategies and initiatives of the NAU Strategic Plan Vision for the physical development of NAU’s Mountain Campus Focus on overall, campus-wide concepts and systems Development strategies for Land Use & Transportation Design guidelines for Bldgs./Grnds. 2008 CMP Update
What the CMP is NOT NOT an Implementation Plan Details on space allocation, project designs & schedules NOT an Academic Plan Details on academic programs NOT a Budget Plan Details on financing strategies, project budgets 2008 CMP Update
Why do master planning? Prepare for the future Establish balance – specific groups & overall campus community Provide consistency over time Provide a general ‘roadmap’ Guidance to decision makers Assist in development of coordinated implementation plans 2008 CMP Update
Objectives of 2008 Update Enhance the 2005 CMP Integrate other new planning studies Refine transit spine concepts Refine parking strategies Expand land use strategies Develop traffic congestion solutions Advance 3-D visualization mapping Enhance community connections 2008 CMP Update
Project Process 5 Workshops with Steering Cmte. #1 to 4 complete; #5 = late March Stakeholder Feedback Students, faculty, staff, neighbors Draft & Final Report Action pending by Steering Committee and President Haeger Roll-Out Presentations of the final report 2008 CMP Update
Project Process 5 Workshops with Steering Cmte. #1 to 4 complete; #5 = late March Stakeholder Feedback Students, faculty, staff, neighbors Draft & Final Report Action pending by Steering Committee and President Haeger Roll-Out Presentations of the final report 2008 CMP Update
Steering Committee Campus Representation Over 25 Organizations & Org. Units Over 35 Students, Faculty, Staff Consultants NAIPTA City of Flagstaff Coconino Community College 2008 CMP Update
Project Process 5 Workshops with Steering Cmte. #1 to 4 complete; #5 = late March Stakeholder Feedback Students, faculty, staff, neighbors Draft & Final Report Action pending by Steering Committee and President Haeger Roll-Out Presentations of the final report 2008 CMP Update
Schedule Outreach and supplemental parking study scheduled for Oct 08-Feb 09 WS#5, draft report rvw and final report rescheduled for Mar/Apr 09
Key Items Integration Coordination Transit Spine Parking Garages Travel Demand Management Neighboring Community Issues Land Use Balance Traffic Congestion Solutions 2008 CMP Update
Report Integration Sustainability
Report Integration Athletics Master Plan
Spine Alignment 2005 Alignment
Spine Alignment 2008 Alignment
Recommended Alignment Spine Alignment • Final Layout
Recommended Alignment Spine Alignment • Final Layout
Wall Aquatic – “before” Photo - 2008
Transit Spine at Wall Aquatic Rendering - Future
Parking Recommended Garage Locations
Parking Where will we park in Fall 09? COMMUTERS
Travel Demand Management Ideas Matrix
Land Use – Green Space, Bldgs, Pkg Photo - 2005
Land Use – Green Space, Bldgs, Pkg Modeled – Future
Land Use – Green Space, Bldgs, Pkg Progress! Union/Raymond/Aspen today
Recommended Solutions Traffic Congestion Dupont Drive Bicycle lanes due for removal Parking Lot P16 Entry direct from Knoles Drive University Drive Crosswalk improvements San Francisco Street / University Drive Add southbound right turn lane Knoles Drive / McConnell Drive Add southbound right turn lane Improve pedestrian crossing Move southbound bus stop Knoles Drive / McConnell Drive Add southbound right turn lane Improve pedestrian crossing Move southbound bus stop Runke Drive / ROTC block cut-through traffic Pine Knoll Drive Restripe for northbound bus lane Move northbound bus stop Increased permit management Not shown on map
Project Process 5 Workshops with Steering Cmte. #1 to 4 complete; #5 = late March Stakeholder Feedback Students, faculty, staff, neighbors Draft & Final Report Action pending by Steering Committee and President Haeger Roll-Out Presentations of the final report 2008 CMP Update
Stakeholder Feedback Campus Groups Progress Brfng. At least 9 groups Forum Progress Briefing 5 sessions over 4 days 2008 CMP Update
Project Process 5 Workshops with Steering Cmte. #1 to 4 complete; #5 = late March Stakeholder Feedback Students, faculty, staff, neighbors Draft & Final Report Action pending by Steering Committee and President Haeger Roll-Out Presentations of the final report 2008 CMP Update
Project Process 5 Workshops with Steering Cmte. #1 to 4 complete; #5 = late March Stakeholder Feedback Students, faculty, staff, neighbors Draft & Final Report Action pending by Steering Committee and President Haeger Roll-Out Presentations of the final report 2008 CMP Update
In Closing … Thanks for getting involved Inviting this presentation Becoming informed Providing feedback 2008 CMP Update
In addition to this presentation: Go to the CMP webpage https://www4.nau.edu/cas/Plan-Dev/NAU_MasterPlan.html View CMP documents 1990, 2005, 2008 Links to other related info Strategic Planning, Sustainability Submit comments electronically use the Q/C/S link 2008 CMP Update