BDI 2013 Developers Conference. 2012 New Construction. New construction valuation for 2012 is $21,313,174. Largest single year total ever. 64 single family permits, which is about average. 81 duplex permits. $2.3 million in new commercial valuation, largest in this category since 2006.

brie
Download Presentation

BDI 2013 Developers Conference

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BDI 2013 Developers Conference

  2. 2012 New Construction • New construction valuation for 2012 is $21,313,174. Largest single year total ever. 64 single family permits, which is about average. 81 duplex permits. $2.3 million in new commercial valuation, largest in this category since 2006.

  3. Bondurant Country Market • Store is 15,690 sq. ft. • Located between Legacy Bank & car wash • Mini Hy-Vee • Two additional store fronts, both 4,000 sq. ft. • Estimated project value is $3.5 million • Opening early 2014 • Drive up coffee window

  4. 2013 SubdivisionsRenaud Ridge 69 lots, 34 in Phase 1

  5. Efnor Estates Plat 3, 29 lots

  6. 2014 ConstructionArbor Ridge Plat 7, 24 lots

  7. Wisteria Heights Plat 4, 20 lots

  8. The City has been contacted about additional residential plats. • No plans submitted yet.

  9. WRA Sewer Connection • Completed by end of 2013 • 36” Sewer Line • Approximately $16 million project • WRA will retain one lagoon for high flow storage • Sludge removal in 2014 • No plans for property at this time • Three lift stations removed as part of construction

  10. Hwy 65/32nd St SW Intersection Improvements • Project will include traffic signals & turn lanes • Current cost est. is $765,000 • It appears that state & federal funds will pay 80%-90% of the cost • Construction to begin later this year • Completion by mid 2014

  11. FreedomRock • To be installed June 2013 in front of American Legion Building on 2nd St NW • Bondurant is the only location in Polk Co. to receive a Freedom Rock

  12. Bondurant Regional Trailhead • Depot Grand Opening June 22 at 9:00 A.M. as part of Biking Bondu annual event • Building cost $200,000 • Total Trailhead cost around $350,000 • REAP funded most of the 2012 Trailhead Paving

  13. Parks Master Plan & Improvements • Wisteria Heights • Wolf Creek • Eagle Park • Lake Petocka • BRSC • BSC • Trailhead “The Depot”

  14. City Property Tax Rate Reduction The City tax rate for FY14 was reduced $.05 for the 7th consecutive year. The City anticipates another $.05 rate reduction for the FY15 budget to be adopted in March, 2014.

  15. Grant Funds Received 2009-2010

  16. Grant Funds Received 2011-2012

  17. Grant Funds Received 2013

  18. Eastern Polk County Is Doing Well • Pleasant Hill- Large Warehouse Project • Altoona- Becoming a National data storage facility hub • Bondurant- Strong residential growth • WRA Connection • Bondurant Country Market • Elementary School • Blue Jay Stadium • Community Recreation Center