An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. XTAX repair Organisation Chantier

  2. EDH/AOC/VIC 4888453 TNRQ table TAX tests + essais 4888444 TNRQ Ouvrir/fermertoiture XTAX 2 et 4 4888335 TNRQ Reparation tables XTAX 4888327 TNRQ Montage bunker TCC2   4888313 TNRQ Demontage bunker EHN1   4888298 TNRQ blocs acier pour bunker TCC2 VIC: mardi 06/03 à 10.00

  3. Blindage Plomb Facteur atténuation de 4

  4. Mini-Scan survey

  5. Activités S9 • Nettoyage rails TA801 • Réception PR537 • Maintenance ventilation CV • Patrouille aimants

  6. Activités S10 • Nettoyage TA801 (Topnet) • Inspection lignes vides (Victor, mardi matin) • Installation bunker • Installation vestiaires TA801 • Retrait barrières et blocs dans le passage • Préparation zone de stockage • Mini-Scan • Dry run PR537 • Déconnexions services