1 / 20

IBM SCPM Replenishment - Order

IBM SCPM Replenishment - Order. October 11, 2014. Order Types. There are three order types: Pull Request Bypass Request Unassigned Pull Request. 1. Pull Request. Accessing an Order. 2. Follow the Menu Path: Orders  Order Summary to access the Order Summary page.

brilliant
Download Presentation

IBM SCPM Replenishment - Order

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IBM SCPM Replenishment - Order October 11, 2014

  2. Order Types • There are three order types: • Pull Request • Bypass Request • Unassigned Pull Request

  3. 1. Pull Request

  4. Accessing an Order 2 • Follow the Menu Path: Orders  Order Summary to access the Order Summary page. • From the Order Type drop-down menu, click the order type you want. • Either, enter filter criteria and click the Filter button to filter the Results list. Or • Click the number that corresponds to the State and Status of the order you want. 1 3 4

  5. Accessing an Order • From the Pull Request List page, click the Pull Number you want to examine. 1

  6. Navigating the Order Page • From the State drop-down menu, you can select the state of schedules (A) you want to view, and then click the Filter button (B) • You can select the Order (C) then click the View History button (D) to view the Order change history A B C D

  7. Pull Requests • Always have one line item (as do all Replenishment docs) • IBM sends to E2open via S2S or manually creates via E2open UI • Can be in one of three states: • New • Blocked • Sent (RSC/Supplier can see) • E2open auto-sends Pull Requests in Sent state to the RSC every 30 minutes This can be customized by Mfg. Line and Hub Code • IBM can manually block/unblock via E2open UI Pull Request must be in New state to block

  8. Pull Statuses and Details

  9. Updating a Pull Request • At the Order page, click the checkbox for the order schedule. • Click the Send button (A) to send the order to the Supplier. or • Click the Block button (B) to block the order or • Update the one or more of the editable boxes (you may have to scroll right) and click the Change button (C) to change the order. 1 B C A

  10. Creating a Pull Request • From the Orders tree, click Order Create to access the Select Supplier page. • At the Select Supplier page, from the Order Type Menu choose Pull Request. • Click the option button for the Supplier you want. • Click the Next button to access the Select Material No. ERP page 2 3 1 4

  11. Creating a Pull Request • At the Select Material No. ERP page, enter your search criteria. • Click the Search button to display your search results. • From the Search Results list, click the check box for the Material you want. • Click the Next button to access the Select Mat. From Supplier Catalog page. • Click the Next button to access the Order page 1 2 3 5 4

  12. Creating a Pull Request • In the Requested Quantity box, enter your request quantity. • Click the Requested Date Calendar icon to select your request date. Note: The date format is US: MM/DD/YYYY • If you want, enter data in the optional data boxes. • Click the Submit Order button to create the and access Order Creation Status page. • At the Order Creation Status page, note the status of your order. System generated number based on site and date. The value is skipped if you abort the Create process here. 2 1 3 4 5

  13. Pull Request Email Alerts

  14. 2. Bypass Requests

  15. Bypass Requests • Always have one line item • Only manual creation via E2open User Interface is possible • Can be in one of six states: • New - DRS Approver must Approve or Disapprove • Blocked (Supplier. cannot view) • Approved – Supplier must Commit to move it to Committed • Disapproved (Sup. cannot view) • Committed – Supplier commits to the request (can update qty/date) • Withdrawn – Bypass request is withdrawn • E2open does not send data as all activity occurs in SCPM.

  16. Updating a Bypass Request • Same process as creating a Pull Request except: • At the Select Supplier page, from the Order Type box you click Bypass Request. • After the Bypass Request is created a DRS Approver must approve or disapprove it. 2

  17. Committing to a Bypass Request • After the DRS Approver approves the Bypass Request, the Supplier must commit to it. 1

  18. Bypass Request Email Alerts

  19. 3. Unassigned Pull Requests

  20. Unassigned Pulls • If you do not assign a supplier, the system will select a supplier for you • SCPM checks to see if single sourced: • If yes, SCPM assigns to that Supplier • If no, SCPM creates unassigned pull • When RSC ships, RSC specifies Supplier • Can be created via S2S only, there is no SCPM workflow

More Related