1 / 26

Construction, Testing, Documentation, and Installation Chapters 15 and 16

Construction, Testing, Documentation, and Installation Chapters 15 and 16. Info 361: Systems Analysis and Design. Key Terminology. Construction is the development of all parts of the software itself, documentation, and new operating procedures.

Download Presentation

Construction, Testing, Documentation, and Installation Chapters 15 and 16

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Construction, Testing, Documentation, and InstallationChapters 15 and 16 Info 361: Systems Analysis and Design

  2. Key Terminology • Construction is the development of all parts of the software itself, documentation, and new operating procedures. • Testing is a form of insurance. It costs more to repair software bugs when people are depending on the programs than in earlier stages before the systems are in use. • Documentation provides information to make the system easier to use and repair. • Conversion is the technical process of replacing the old system with the new one. Designers select the method, timing, and location of the conversion process. Construction and Installation

  3. Main Tasks of Managing the Programming Effort • Assigning the programmers • Coordinating the activities • Managing the schedule Construction and Installation

  4. The Programmer Paradox • After an appropriate number of people are assigned to a programming task, adding more people slows down rather than speeds up completion of the project. • When projects are so complex they require a large team, the best strategy is to break the project into a series of smaller parts that can function as independently as possible. Construction and Installation

  5. Managing the Schedule • Use initial time estimates as a baseline • Revise time estimates as construction proceeds • Fight against scope creep • Monitor “minor” slippage • Create risk assessment and track changing risks • Fight the temptation to lower quality to meet unreasonable schedule demands Construction and Installation

  6. Avoid Classic Mistakes 1. Research-oriented development If you use state-of-the art technology, lengthen planned time 2. Using “low-cost” personnel If using a significant number of entry level personnel, lengthen planned time 3. Lack of code control Use source code library to keep programmers from changing the same code at the same time 4. Inadequate testing Always allocate sufficient time for formal testing Construction and Installation

  7. Stages of Testing • Unit testing • Tests each module to assure that it performs its function • Integration testing • Tests the interaction of modules to assure that they work together • System testing • Tests to assure that the software works well as part of the overall system • Acceptance testing • Tests to assure that the system serves organizational needs Construction and Installation

  8. Error Discover Rates Construction and Installation

  9. Unit Testing • Black Box Testing • Focuses on whether the unit meets requirements stated in specification • White-Box Testing • Looks inside the module to test its major elements Construction and Installation

  10. Integration Testing • User interface testing • Tests each interface function • Use-case testing • Ensures that each use case works correctly • Interaction testing • Tests each process in a step-by-step fashion • System interface testing • Ensures data transfer between systems Construction and Installation

  11. System Testing • Requirements Testing • Ensures that integration did not cause new errors • Usability Testing • Tests how easy and error-free the system is in use • Security Testing • Assures that security functions are handled properly • Performance Testing • Assures that the system works under high volumes of activity • Documentation Testing • Analysts check that documentation and examples work properly Construction and Installation

  12. Acceptance Testing • Alpha Testing • Repeats tests by users to assure they accept the system • Beta Testing • Uses real data, not test data Construction and Installation

  13. User Documentation • Intended to help users operate the system • High quality documentation takes about 3 hours per page • The task should not be left to the end of the project • Time required to develop and test user documentation should be built into project plan • Types of user documentation: • Reference documents • Procedures manuals • Tutorials • On-line documentation is growing in importance Construction and Installation

  14. Implementing Change • Transitioning to new systems involves managing change from pre-existing norms and habits. • Change management involves: • Unfreezing -- loosening up peoples’ habits and norms • Moving -- transition from old to new systems • Refreezing -- institutionalize and make efficient the new way of doing things Construction and Installation

  15. Post-Implementation • Post-implementation activities include providing: • System support, such as help desks • Systems maintenance, fixing bugs and providing improvements • Project assessment, learning how to improve from project experiences Construction and Installation

  16. Migration Planning • What activities will be performed when and by whom Construction and Installation

  17. Conversion Styles • Direct conversion • The new system instantly replaces the old • Parallel conversion • For a time both old and new systems are used. The old is abandoned when the new is proven fully capable Construction and Installation

  18. Conversion Location • Pilot conversion • One or more locations are converted to work out bugs before extending to other locations • Phased conversion • Locations are converted in sets • Simultaneous conversion • All locations are converted at the same time Construction and Installation

  19. Conversion Modules • Whole system conversion • All modules converted in one step • Modular conversion • When modules are loosely associated, they can be converted one at a time Construction and Installation

  20. Conversion Strategies Construction and Installation

  21. Selecting a Conversion Strategy • Risk • Seriousness of consequences of remaining bugs • Cost • Parallel requires paying for two systems for a period of time • Simultaneous requires more staff to support all locations • Time • Parallel, phased, and modular require more time Construction and Installation

  22. Understanding Resistance to Change • What is good for the organization, is not necessarily good for the individuals who work there • Cost versus benefit of transition as well as of to-be system • Adapting to new work processes requires effort, for which there may be no additional compensation Construction and Installation

  23. No computer system will be successfully adopted unless management policies support its adoption Management tools for supporting adoption Standard operating procedures (SOPs) Measurements and rewards Resource allocation Revising Management Policies Construction and Installation

  24. Every new system requires new skills New skills may involve use of the technology itself New skills may be needed to handle the changed business processes Training Construction and Installation

  25. Institutionalization of the System • Provide support • Assistance in using the system • Provide maintenance • Repair or fix discovered bugs or errors • Add minor enhancements to provide added value • Assess the project • Analyze what was done well • Discover what activities need improvement in the future Construction and Installation

  26. Sources of Change Requests 1. Problem reports from the operations group 2. Requests for enhancements from users 3. Requests from other systems development projects 4. Change requests from senior management Construction and Installation

More Related