1 / 5

Front End Processing Working Group

Front End Processing Working Group . Digitisation P.Medina Pre-processing I.Lazarus GTS M.Bellato PSA P.Desesquelle R.Gernhäuser. 7 th AGATA Week, Uppsala, July 8-11, 2008. Gobal Trigger. Detector preamps. Detector Level. Digitisers. Ancillary. Clock 100 MHz T-Stamp .

brock
Download Presentation

Front End Processing Working Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Front End Processing Working Group • Digitisation P.Medina • Pre-processing I.Lazarus • GTS M.Bellato • PSA P.Desesquelle R.Gernhäuser 7th AGATA Week, Uppsala, July 8-11, 2008

  2. Gobal Trigger Detector preamps Detector Level Digitisers Ancillary Clock 100 MHz T-Stamp Core + 36 seg. PSA Pre-processing Ancillary GlobalLevel EventBuilder Control, Storage… Tracking Ancillary • interface to GTS via mezzanine • merge time-stamped data into event builder • prompt local trigger available from digitisers Ancillary detectors Structure of EDAQ

  3. GL-Trigger (+ 120 MB/s written out at PSA level) Initially traces will be recorded for off-line validation Initial Data rates for Demonstrator15 detectors, 10 kHz singles, GL-trigger, Ancillary  1kHz into PSA SEGMENT Pre-processing save ~100 samples of signal rise time 200 MB/s 100 Ms/s 14 bits + - Energy+· · · ADC 0.2 MB/s LL-Trigger (CC) DETECTOR E, t, x, y, z,... 1 ms/event Pulse Shape Analysis 200 B/ev 0.2 MB/s 36+2 8 kB/event ~8 MB/s GLOBAL AGATA Merge Ancillary Merge g-ray tracking HL-Trigger, Storage On Line Analysis, … 15*0.2  3 MB/s

  4. General schedule for 2008 Slide from the previous AGATA week (Nov. 2007 @ LNL) MUST BE UPDATED • Q1 • Reworked ATCA Carrier • Reworked Segment Mezzanines • New Core Mezzanine • Q2 • Electronics for one detector; VHDL revision -1 • Start series production of all modules • 36+ ATCA carriers IPN Orsay • 108+ Segment Mezz. 18+ Core Mezz. CSNSM Orsay • 30+ GTS mezzanines INFN Padova • Q3 • Electronics for one triple cluster; VHDL revision 0 • Q4 • Phased delivery of final electronics

  5. Program of session 7 • Digitizers Patrice M. / Patrick C.S. • Pre-processing electronics Ian L. • ATCA Carriers and TCKL board • Processing mezzanines • Readout to PSA • GTS and global trigger • Integration of electronicsDino B.

More Related