1 / 23

Network Background

Network Background. August 2006. Topics. Services Connected Institutions Architecture Operations Finances/Co-pay Looking Forward. K-20 Services. Washington State Education Intranet Distance Learning Research Video Conferencing (including multi-point)

brone
Download Presentation

Network Background

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Network Background August 2006

  2. Topics • Services • Connected Institutions • Architecture • Operations • Finances/Co-pay • Looking Forward

  3. K-20 Services • Washington State Education Intranet • Distance Learning • Research • Video Conferencing (including multi-point) • Business Applications and Business Continuity • Internet Access • Internet & WWW • Internet 2

  4. Currently Connected Institutions K-12 Locations 306 Community & Technical College Sites 72 Public Baccalaureate Sites 40 Public Library Sites 26 Telemedicine Sites 19 Private College and University Sites 7 Tribal Education Centers 11 Correctional Facilities 3 TOTAL K-20 SITES: 484

  5. District/Campus Routers Institution Router K-20 Data Equipment K-20 Network District/Campus Video Equipment Codec & Video Equipment Network Responsibilities K-20 Network Control (KOCO) K-20 ON-GOING COSTS INSTITUTION ON-GOING COSTS • Transport • KOCO • Maintenance • Depreciation • Video maintenance & depreciation • PCs & LANs • Training • Intra-district infrastructure • ISP

  6. K-12 (306) Community/Technical College (72) Public College/University (40) Tribal Education Center/ (11) (includes branch campuses)(includes branch campuses) Tribal College Library (26) Correctional Facility (3) Independent College/University (8) Telemedicine (19)

  7. Current NGN Current vs. NGN Architecture • Carrier circuits provide protection switching • SONET only • Ring of Rings • State manages protection • Wave basis/MSPP • Ring architecture

  8. K20/DIS NGN Benefits • Will efficiently and cost-effectively: • Create a resilient architecture – no single point of failure • Increase the robustness – better scaling • Reduces dependency on carrier’s ability to build resiliency in their networks • Allow state to leverage all state transport resources

  9. K-20 Operations Cooperative • KOCO: DIS, UW, SBCTC • Monitor Network & Server Status • Troubleshoot Network Problems • Coordinate Problem Resolution • Provide & Analyze Network Performance Data • Provide Technical Support • Manage Video Switched Network and MCUs • Schedule Multipoint Video Resources • Program Office Support

  10. ISP cost per Mbps Mbps ISP traffic FY00 FY06 FY01 FY02 FY03 FY04 FY05 Internet Traffic and Cost

  11. Co-pay Basic Principles • Co-pay for the same services is to be independent of geographic location • Co-pay must compete with similar services in low-cost areas • Co-pay must be independent of type of transport • Co-pay must encourage proper management of resources

  12. 10 8 6 4 2 0 6 am noon midnight 6 pm Capacity vs. Usage BasedCo-pay • Capacity Based: • User charge based upon capacity provided • Usage Based: • User charge based upon usage of the capacity provided, calculated at 95th % capacity (10 Mbps) Mbps usage (2.5 Mbps)

  13. $5,000 $4,375 $3,750 $3,125 Quarterly Fee $2,500 $1,875 $1,250 $625 $- Co-pay for Data Circuits 0.0 1.5 3.0 4.5 6.0 7.5 9.0 10.5 12.0 13.5 15.0 95th Percentile Usage (Mbps)

  14. K-20 Board – Budget ResponsibilitiesRCW 43.105.805 • Prepare a budget for network development, operation, and expansion including: • Network transport and equipment • Co-payments for public entities connected to the network • Charges to non-governmental entities connected to the network

  15. Technical Subcommittee Develops Network Design Updates Budget Recommended To K-20 Board Budget Development Process Educational Sectors Assess 07-09 Needs Support Organizations Develop Support Costs K-20 Office Develops Draft Detailed Budget Budget Reviewed and Approved by NTSC and Finance Subcommittee

  16. K-20 Operations Categories of Expense (07-09) Maintenance & Depreciation $7.3 M (27%) Transport $8.7 M (32%) Program Office $2.0 M (7%) KOCO $9.0 M (34%) $27 M in Expenses

  17. K-20 07-09 Revenue Sources State General Fund $20.2 M Participant Co-Pay 6.0 M Qwest (Libraries) .8 M $27.0 M

  18. 6000 5000 4000 3000 2000 1000 0 K-20 Intranet Traffic billions of bytes FY 01 FY 05 FY 06 FY 00 FY 02 FY 03 FY 04 FY 07 FY 08 FY 09

  19. 6000 $ 60 M 5000 $ 50 M 4000 $ 40 M 3000 $ 30 M $ 27.8 M $ 27.0 M $ 28.2 M $ 26.3 M $ 27.0 M 2000 $ 20 M 1000 $ 10 M 0 $ 0 K-20 Expense billions of bytes FY 01 FY 05 FY 06 FY 00 FY 02 FY 03 FY 04 FY 07 FY 08 FY 09

  20. 6000 $ 60 M 5000 $ 50 M 4000 $ 40 M 3000 $ 30 M $ 22.8 M $ 22.6 M 1 $ 20.9 M $ 19.8 M 2 $ 20.2 M 2000 $ 20 M 1000 $ 10 M 0 $ 0 State General Fund Requests billions of bytes FY 01 FY 05 FY 06 FY 00 FY 02 FY 03 FY 04 FY 07 FY 08 FY 09 (1) includes $11.3 M provided by K-20 accumulated cash (2) includes $3 M Qwest Settlement Funds; $3.1 M K-20 accumulated cash

  21. Capital Purchases • Budget includes estimated 07-09 capital purchases • Replacement of aging network equipment • Continued phase-in of IP-based video • Equipment to support updated architecture and migration to high-speed Ethernet • Network management capabilities • Purchases to be made from K-20 revolving fund (accumulated depreciation)

  22. K-20 Revolving Fund (07-09) Estimated cash position 6/30/07 $2.1 M Revenues • GF state appropriation 20.2 M • Co-pay 6.0 M • Qwest library funds 0.8 M Operating expenses (less depreciation) (22.1 M) Capitalized purchases (4.7 M) Estimated cash position 6/30/09 $2.3 M

  23. Looking Forward • Board Subcommittee for Program • Biennial report • Value stories • New website; education focused • FY08/FY09 Budget Process • Approved by the K-20 Board • Will submit to OFM in August • Next Generation Network • Procurement Summer & Fall 2006 • Construction Winter 2006; Transition 2007