An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RMIB GERB Processing status S. Dewitte Royal Meteorological Institute of Belgium GIST, Brussels, 08-10/11/2004

  2. Overview • Operational processing. • Product quality status. • Data release plan. GIST, Brussels, 08-10/11/2004

  3. Operational processing • GERB/SEVIRI processing ongoing except during data outages. • GERB/MS7A processing stopped begin July. GIST, Brussels, 08-10/11/2004

  4. Geolocation • No change in near real-time geolocation. • Geolocation per 5’ saved in ‘G2L15G’ files. GIST, Brussels, 08-10/11/2004

  5. Calibration • Operational processing still uses old spectral response: SW calibration OK but scene dependent GERB/CERES ratio. • One day tests for interim and reprocessed spectral response: GERB SW 12% too high compared to CERES. • To be discussed: cross-calibrate GERB SW with CERES SW ? GIST, Brussels, 08-10/11/2004

  6. Unfiltering • Improved correction for LOS non repeatability error on daytime LW implemented, but not yet activated. • New spectral data base under construction (see presentation Nicolas). GIST, Brussels, 08-10/11/2004

  7. Cloud detection • Cloud detection in sun-glint region improved (see presentation Alessandro). • TBD improvement near terminator (see presentation Alessandro). GIST, Brussels, 08-10/11/2004

  8. Thermal fluxes • Night time LW fluxes: empirical correction to theoretical ADM’s defined from comparison with CERES (see presentation Steven) • Day time LW fluxes: additional correction needed over desert (see presentation Steven) GIST, Brussels, 08-10/11/2004

  9. Solar fluxes • CERES SW ADM adjustments understood, to be implemented (see presentation Cedric) • Fluxes to be validated by comparison with CERES from Jan-Jun 2004. GIST, Brussels, 08-10/11/2004

  10. Flagging • NANRG flags to be used to remove data affected by sunglint and quartz filter anomaly. • Flags to be defined for LOS non repeatability correction. GIST, Brussels, 08-10/11/2004

  11. Data release plan • All mentioned changes to be implemented in parallel by end of 2004. • Validation of changes in Jan 2005. • ARG data release: end Jan 2005. • Reprocessing of data back to June 2003 ended in July 2005. GIST, Brussels, 08-10/11/2004

More Related