An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GERB Ground Segment B.C.Stewart RAL Ground Segment (GGSPS) Report

  2. Topics • Processing System • EUMETSAT interface • RMIB interface • User access • Operations • Meetings/ management Ground Segment (GGSPS) Report

  3. Processing System Status • Processing software (now at V12): • Handling of new instrument modes • Improvements in robustness • Geolocation tuning • Ongoing population of engineering products • Gains and offsets added to L15N products • Preparation for inclusion of Integrating Sphere data • Preparation for re-processing • Updated SEVIRI header selection algorithm • Problems (INGRES, Data Reception) • Future Work Ground Segment (GGSPS) Report

  4. INGRES • Problem with INGRES database, started 26th Feb, • caused GGSPS components to “hang” • frequency increased up to ~once per day • on some occasions led to loss of raw data • Changes made: • database re-configured: didn’t fix it (frequency reduced?) • additional diagnostic logging in GGSPS software • updated GGSPS messaging to prevent loss of raw data due to system hang • Problem not seen since (> 2 weeks smooth running) • We still do not understand this problem… Ground Segment (GGSPS) Report

  5. Other problems • Data Reception: “real data” problems • detection of corrupted data: packet checksum • handling of instrument ‘transitional’ mode changes • Upgrades to DR planned for the near future to address both of these problems • Minor problems generating “pseudo SEVIRI header” files Ground Segment (GGSPS) Report

  6. Future work • Robustness: improve error handling, make the system more “driveable” to facilitate hand-over to an operator • Product Processing: product validation, tuning geolocation, complete population of Eng products • Level 2 monthly averaging: coding not started • Re-Ordering to fill in data gaps (breaks in transmission from Eum, GGSPS outages) • User interface: web pages, product documentation Ground Segment (GGSPS) Report

  7. EUMETSAT – RAL interface • Formal tests with EUMETSAT – line basically works. • Missing packets – still few 10’s / day cause still not known, comparison planned with UMARF, GGSPS and EUMETSAT interest. Longer gaps understood (EUMETSAT/ GGSPSsystem problems, GERB telemetry switched off) • Leased line appears to have behaved faultlessly once initial problems sorted out • EGSE currently being used to provide an ‘online’ pipeline for remaining functional/ calibration tests Ground Segment (GGSPS) Report

  8. RMIB interface • Formal tests not complete but product interchange works. • 15 min files transferred in typically <10 seconds Ground Segment (GGSPS) Report

  9. User access URL : http://ggsps.rl.ac.uk/ • Website operational and being used by ICSTM, Reading … • Initial access not password protected, product and catalogue access password protected • Catalogue searches based on date and product type • individual file download from search results • multiple (<=600) file download from search results • Bulk download of latest day’s data (in 6hr blocks) • Basic read/plot software available • Engineering/ performance plotting system in place and accessible – daily plots of parameters, long term trends. Evolving in consultation with ICSTM and instrument builders. • Background information: product user guides in progress • “Discussion forum” link to be added Ground Segment (GGSPS) Report

  10. Operations - evolution • EUMETSAT-ICSTM/RAL Interface Control Document • being updated (report format evolution, points of contact, GGSPS & GOT usernames) • EUMETSAT reports • Commanding, Related SEVERI functions, Line anomalies • GOT functions • Transfer RAL => ICSTM (commands files, tables) • Flight Operations Manual (FOM) • To be updated in light of experience (limits, SAFEing function) • EEPROM • Nominal tables uploaded Ground Segment (GGSPS) Report

  11. Meetings • Weekly GGSPS technical (RAL internal) • actions, system status/ planned upgrades, current problems eg INGRES, any new issues, periodically review Change Requests, NCRs • Project Scientist • 4-6 weekly GERB operations (RAL, ICSTM, RMIB, LU) • Reports/ plans, GGSPS, Project Scientist, GOT, RMIB (includes analysis and anomalies) • EUMETSAT issues • Commissioning activities • Minutes and actions • For the future CAL/ VAL or another forum? Ground Segment (GGSPS) Report