60 likes | 169 Views
Labor Requirements:. 2 employees: depanning 1 employee: loading bread baskets. Supervisor Contact Information: Paul Adams:. Cheesecake Depanning Layout. New Depanning Area. Conveyor Path Used. Current Depanning Area. Cheesecake Depanning Layout. Water Spider. Conveyor. Empty Pan Rack.
E N D
Labor Requirements: 2 employees: depanning 1 employee: loading bread baskets Supervisor Contact Information: Paul Adams:
Cheesecake Depanning Layout New Depanning Area Conveyor Path Used Current Depanning Area
Cheesecake Depanning Layout Water Spider Conveyor Empty Pan Rack Work Table Depanning Worker Stack of “Bread Baskets”
Connect U-conveyor at tunnel oven end - At current state, wheel water receptacle to unload to pour out water 2. Set oven at correct oven speed (Contact Night Supervisor)
At Proposed Depanning Station: 3. Angle blue conveyor to fit a station on both sides • Set up station on both sides of blue conveyor as shown below and in the drawing on the previous page Station 1 Station 2 Conveyor
5. On each station (set-up similar to current process) • Foam holders • Bread baskets