3 4 1 2 E. Gschwendtner, CERN
Access on 11 October 2011 • Visit of muon pit area • Technical Stop 7 – 11 November 2011 • Access only from Tue 8 Nov – Friday 11 Nov (15:00) • Transport of cables ~0.5 days • Cable installation ~2 days • Cable connection & testing ~1 day • Installation of detectors • Testing detectors! In parallel: • Power supply • Fibre optics cables • Ethernet installation • Installation of Racks Only diamond detector installation feasible! E. Gschwendtner, CERN
Fibre optics cables US85 TE80 8fibres 12 fibres TZ80 4 fibres ? Max 24 fibres ? How many fibres do we need? E. Gschwendtner, CERN
Area 3: Crossing TNM41 – TZ81 and TNM42 – TZ82 Electronics Rack Ethernet Rack To Area 4 To Area 2 (TNM42) To Area 1 (TNM41) E. Gschwendtner, CERN
Hadron stop E. Gschwendtner, CERN