1 / 14

April 30, 2009 County Accountants’ Conference

April 30, 2009 County Accountants’ Conference. Merry Daher. Federal Aid Plans Engineer Phone: (651) 366 3821 Fax : (651) 366-3801 Email: merry.daher@dot.state.mn.us. What we will go over today. ARRA (American Recovery & Reinvestment Act of 2009) HPP Funding Breakdowns & Paybacks

burt
Download Presentation

April 30, 2009 County Accountants’ Conference

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. April 30, 2009 County Accountants’ Conference

  2. Merry Daher • Federal Aid Plans Engineer • Phone: (651) 366 3821 • Fax : (651) 366-3801 • Email: merry.daher@dot.state.mn.us

  3. What we will go over today • ARRA (American Recovery & Reinvestment Act of 2009) • HPP Funding Breakdowns & Paybacks • Advertising

  4. ARRA • 100% Federal Funds (for Eligible items) • Same requirements as any other Federal project • PLUS • Federal Certification by Washington DC • Additional Proposal Contents • Additional Reporting Requirements • 100% Audit Probability (CFDA No. is 20.205)

  5. ARRA Reporting • Advertisement date • Federal Permit approvals • Award date • DBE goal & clearance • Notice to Proceed date • Percent Complete • Contractor Information . . .

  6. Contractor Information • Contractor Name • Addrress • E-mail address

  7. Out-State ARRA Program • 24 out-state road projects • 19 projects have come in • 15 are out for bids • 23 out-state bridge projects • 18 projects have come in • 14 are out for bids • First to be let is in Morrison County – today.

  8. Metro ARRA Program • Three tiers STP • Tier I – 3 proj. previously in STIP MnDOT will contribute ARRA $ • Tier II – 2 proj. already in STIP that will be made whole by ARRA $ • Tier III – 32 will get some ARRA $ - not 100% for construction only • ARRA Enhancement – • 6 – 16 projects to be selected (1.3 million max ARRA$)

  9. 2009 Construction Projects Summary Out State – 47 ARRA projects Metro – 43 – 53 ARRA projects Out State – 127 Regular projects Metro – 30 -35 Regular projects

  10. Advertising – Bid Opening • Designated Publication • Trade Journal • Mn/DOT Website • Timing determined by MN Statute 160.17 • County: 3 weeks + 10 days • Towns: 2 weeks + 10 days

  11. E-Advertising The SALT site can be accessed from MN/DOT webpage listing Mn/DOT projects SALT site will contain abbreviated ads linked to full ads. Submit ads through One Office or SALT Website Expect 2 day turn around for posting once information is approved.

  12. E-Advert Basic Requirements 1)Your County must have a website or link where the full ad can be placed. • (i.e. County Website, One Office, Quest.cdn) 2) “Non” One Office users will need a logon ID & password.

  13. E-Advert SALT web advertising will parallel Construction Bulletin for about a year Important to transition away from CB as the Trade Journal for business consistency Need to work out affidavit of Publication (This is to satisfy auditors on state advertising req’ts)

  14. QUESTIONS??

More Related