1 / 24

Central Maine Power Company Local System Plan Presentation Planning Advisory Committee Meeting October 21, 2010

Central Maine Power Company Local System Plan Presentation Planning Advisory Committee Meeting October 21, 2010. Purpose of Local System Plan. Per Attachment K – Local, this LSP presentation: Describes projected improvements to non-PTF that are needed to maintain reliable customer service.

burt
Download Presentation

Central Maine Power Company Local System Plan Presentation Planning Advisory Committee Meeting October 21, 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Central Maine Power Company Local System PlanPresentationPlanning Advisory Committee MeetingOctober 21, 2010 1

  2. Purpose of Local System Plan Per Attachment K – Local, this LSP presentation: Describes projected improvements to non-PTF that are needed to maintain reliable customer service. Reflects: LSP Needs Assessments Corresponding transmission system planning studies 2

  3. LSP Communication • LSP is communicated to the PAC at an ISO-NE PAC RSP meeting once a year. • Separate meetings can be arranged if needed • PAC, Transmission Customers, and other Stakeholders have 30 days to provide written comments for consideration to CMP • CMP’s contact: Curtis Beveridge Manager System Planning Central Maine Power Company 83 Edison Drive Augusta, Maine 04336 (email: curtis.beveridge@cmpco.com) 3

  4. LSP Communication cont. • Each PTO is individually responsible for publicly posting and updating the status of its respective LSP and the transmission projects list on a website in a format similar to the RSP project list • The ISO-NE RSP project list contains links to each individual PTO’s transmission project list • CMP’s LSP project list is located at: http://www.cmpco.com/SuppliersAndPartners/TransmissionServices/CMPTransmissionSvc/lsp.html 4

  5. CMP LSP Project List • Central Maine Power will update the LSP project list at least annually. • A presentation of the LSP will be made annually. • LSP Project List is a cumulative listing of proposed transmission solutions intended to meet identified needs. • Similar to PTF projects in the RSP, the LSP project list contains a status of each non-PTF project: 5

  6. CMP’s Local System Planning Process All CMP system upgrades are determined in accordance with Central Maine Power Company Transmission Planning Criteria. Planning studies can result from: Periodic Assessment of CMP’s 14 Local Planning Areas Load Growth Retail or Wholesale Customer Request Generator Interconnection Request System-Wide Contingency Analysis Studies may utilize both ISO-NE Library Base Cases and/or Local CMP Base Cases. Generator Interconnections on the non-PTF Transmission System are guided by the CMP Transmission & Distribution Interconnection Requirements for Generation. 6

  7. LSP Projects 7

  8. LSP Projects 8

  9. LSP Projects 9

  10. LSP Projects 10

  11. LSP Projects 11

  12. LSP Projects 12

  13. LSP Projects 13

  14. LSP Projects 14

  15. LSP Projects 15

  16. LSP Projects 16

  17. LSP Projects 17

  18. LSP Generation Projects 18

  19. LSP Generation Projects 19

  20. LSP Generation Projects 20

  21. LSP Generation Projects 21

  22. LSP Future Studies 22

  23. Potential NTA Projects 23

  24. In-Service LSP Projects 24

More Related