The air traffic controller’s perspective on runway excursion hazards and mitigation options. Session 2 Presentation 3. Runway excursion hazards associated the ATCs are generally related to: Contributions to unstable approaches Inaccurate surface/meteorological information

burt
Download Presentation

The air traffic controller’s perspective on runway excursion hazards and mitigation options

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The air traffic controller’s perspective on runway excursion hazards and mitigation options Session 2 Presentation 3

  2. Runway excursion hazards associated the ATCs are generally related to: • Contributions to unstable approaches • Inaccurate surface/meteorological information • ATC actions that are incompatible with prevailing conditions

  3. Communication Hazards • Failure to provide timely, accurate and complete information : • runway condition and braking action reports • weather information • surface wind data • winds in magnetic in order to be consistent with runway headings • Establish a manual outlining • information requirements • Reporting criteria • Updating criteria • Establish checklist processes

  4. Operational Hazards • ATC factors that contribute to unstable approaches • Airspace constraints • Not fit for purpose e.g. airspace size, complexity of procedures • ATC provides approach profile that is incompatible w/ prevailing conditions • Vectoring to short final • Vectors above the glide slope • Speed control • High speed approaches • Speed vs. configuration requirements • Last minute approach/runway clearance changes • Inadequate distance from touchdown information • Insufficient traffic flow management • Pressure to meet performance targets, i.e., reduce delays/increase capacity • Inadequate training • Failure of approach aids • Establish policy and procedures to mitigate each factor • Provide initial and recurrent training • Establish awareness campaigns • Implement a notification process for any system failure • Utilize SMS prior to implementing any operational change

  5. Operational Hazards • Not using actual winds on the ATIS  Update manual to require use of actual winds • Lack of procedures for operations on complex runways • Identify hazards • Establish mitigation options

  6. Operational Hazards (cont.) • Runway selection • Incompatible aircraft type  Establish a procedure for runway selection based on aircraft type • Late changes • Establish runway change cut-off points • Runway selection based on ATC preferences or noise abatement requirements.  Base runway selection on technical best practices

  7. Meteorological Hazards • Meteorological/runway condition information systems not available • Meteorological information not available or conflicts with conditions experienced by aircraft • Inform the operating crew that the information system in not available • Establish a system to manage the risk associated with the system failure

  8. Construction Hazards • Crews not aware of revised take-off/landing distance • Establish procedures for operations on shortened runways • ATIS • Verbal reminder

  9. Airport Design Hazards • Tower location that prevents the monitoring of multiple runway operations • Inability to detect confusion events • Additional runway/taxiway signage • Utilize technology such as • Airport Surface Detection Equipment (ASDE-X) • Precision Radar Monitoring (PRM) • Specific procedures to address the blind spots

  10. THANK YOU