WASTE MANAGEMENT HIERARCHY Cleaner Production / Waste Minimisation Treatment Reuse / Recover / Recycle Disposal
Challenges • Quality requirements • Energy requirements • Land requirements • Operation and Maintenance
ADVANCED BIOLOGICAL TREATMENTS • Advanced Biological Treatments Include • Membrane Bioreactor (MBR) • Sequential Batch Reactor (SBR) • Moving Bed Bioreactor (MBBR) • Pure Oxygen Technology • Biological Heavy Metal Removal
System Rate (kg BOD/m3.d) Typical Loading Removal Efficiency (%) Complete Mix ASP 0.3 – 1.6 85 - 92 Extended Aeration 0.1 – 0.3 95 -98 Membrane Bioreactor 1.8 – 5.7 96 - 99 Moving Bed Bioreactor 1.0 – 1.4 91 - 98 Sequencing Bioreactor 0.1 – 0.3 97 – 99 High Purity Oxygen 1.3 - 3.2 96 - 98 ADVANCED BIOLOGICAL TREATMENTS • Typical Volumetric Loading and Removal Efficiency for Various Systems
REFINERY WASTEWATER BALANCE • FLOW TO CONVENTIONAL ETP : 750 M3/HR (435 M3/HR DISCHARGED AFTER TREATMENT ALONGWITH 66 M3/HR OF RO REJECT) • FLOW TO FILTRATION UNIT & UF : 315 M3/HR • UF PERMEATE : 315 M3/HR (218 M3/HR IS SUBJECTED TO RO & 97 M3/HR IS BLENDED WITH RO PERMEATE & EVENTUALLY USED FOR COOLING TOWER MAKE UP) • FLOW TO RO SYSTEM : 218 M3/HR • RO PERMEATE RECOVERED : 152 M3/HR BLENDED WITH UF PERMEATE & USED AS COOLING WATER MAKE UP • RO REJECT : 66 M3/HR IS DISCHARGED ALONGWITH BIOLOGICALLY TREATED WASTEWATER • WATER RECOVERED = 97 + 152 = 249 M3/HR USED AS COOLING TOWER MAKE UP
DETAILS OF WASTEWATER TREATMENT - REFINERY PRELIMINARY TREATMENT UNITS FOR SPENT CAUSTIC - SPENT CAUSTIC TANK, REACTION TANK, H2O2 DOSING SYSTEM TREATMENT UNITS FOR COMBINED WASTEWATER • PRIMARY TREATMENT TERTIARY TREATMENT • IS SUMP - FILTER FEED / CHLORINATION SUMP • SS SUMP - DMF & ACF • SURGE TANKS - HRSCC • SPLITTER BOX - MULTIGRADE FILTER • API - BASKET STRAINER • TPI - ULTRA FILTRATION • DAF - REVERSE OSMOSIS • CHEMICAL DOSING SYSTEMS - CHEMICAL DOSING SYSTEM • SECONDARY TREATMENT • BIOTOWER FEED SUMP • BIOTOWER • AERATION TANK • SECONDARY CLARIFIER • GUARD POND • CHEMICAL DOSING SYSTEMS
EMULSIONS PLANT- WATER BALANCE • TOTAL WATER REQUIREMENT - 253 M3/DAY • TOTAL EFFLUENT FROM PLANT FLOWING TO ETP -128 M3/DAY (Including reject from WTP RO) • PERMEATE RECOVERED FROM ETP – 99 M3/DAY (87 M3/DAY USED AS WTP FEED & 12 M3/DAY USED AS BOILER MAKE UP) • RO REJECT (28 M3/DAY) FROM ETP SUBJECTED TO EVPORATION (CONDENSATE RECOVERD : 28 M3/DAY USED AS WTP FEED) • SOLID WASTE FROM ETP (1 M3/DAY) & RMS : 0.5 TPD (85% DRY SOLIDS) FOR LANDFILL • LIQUID EFFLUENT DISCHARGE – ZERO • WATER RECOVERED = 127 M3/DAY, 115 M3/DAY USED AS WTP FEED & 12 M3/DAY USED AS BOILER FEED • FRESH RAW WATER REQUIREMENT - 126 M3/DAY
FLOOR WASH 45 M3/D REJECT MANAGEMENT SYSTEM (RMS) 28 M3/D 10 M3/D DOMESTIC SOLIDS FOR DISPOSAL 28 M3/D CONDENSATE COOLING TOWER MAKE UP RAW WATER FROM BOREWELL 126 M3/D 103 M3/D 48 M3/D WATER TREATMENT PLANT (WTP) 87 M3/D 88 M3/D PROCESS & UTILITIES RO REJECT SLUDGE UF BACKWASH 3 M3/D PF BACKWASH MGF BACKWASH RO PERMEATE FOR 25 M3/D RO REJECT RO PERMEATE 6 M3/D 5 M3/D 11 M3/D RO PERMEATE TO BOILER MAKEUP 12 M3/D WASTEWATER TREATMENT PLANT (WWTP) 99 M3/D 15 M3/D BOILER & CT BLOWDOWN 8 M3/D DRY SLUDGE DOMESTIC EFFLUENT TO SECURED LANDFILL 1M3/D PROCESS EFFLUENT 55 M3/D WATER BALANCE DIAGRAM- EMUSIONS PLANT
DETAILS OF WTP - EMULSIONS PLANT • - RAW WATER STORAGE TANK • - HRSCC • - PRESSURE SAND FILTER (PSF) • ULTRA VIOLET UNIT (UV) • REVERSE OSMOSIS UNIT (RO) • - CHEMICAL DOSING SYSTEM
PVC PLANT – WATER BALANCE • TOTAL WATER REQUIREMENT - 4030 M3/DAY • TOTAL EFFLUENT FLOWING TO ETP - 3178 M3/D • 100 M3/D CTBD USED FOR GREEN BELT DIRECTLY • 250 M3/D NEUTRALISED DM REG. USED FOR GREEN BELT • 1070 M3/D OF UF PERMEATE RECYCLED TO DM PLANT • 1025 M3/D OF UF PERMEATE RECYCLED AS CT MAKEUP • 786 M3/D RO PERMEATE RECYCLED TO PROCESS • RO REJECT (197 M3/D) & SLUDGE (100 M3/D) FROM ETP SUBJECTED TO EVPORATION (290 M3/D OF CONDENSATE RECOVERED USED FOR PROCESS) • SOLIDWASTE FROM RMS : 5.8TPD (85% DRY SOLIDS) FOR LANDFILL • LIQUID EFFLUENT DISCHARGE – ZERO • WATER RECOVERED = 100+250+1070+1025+786+290 = 3521 M3/D • FRESH RAW WATER REQUIREMENT - 509 M3/D