1 / 9

Sustainability, accessibility and transport strategy management

Sustainability, accessibility and transport strategy management. Manouchehr Nahvi Presentation to Sustainability Managemen Group Ashridge Conference Centre 8 April 2008. Luton Airport. Road Schemes.

caden
Download Presentation

Sustainability, accessibility and transport strategy management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sustainability, accessibility and transport strategy management Manouchehr Nahvi Presentation to Sustainability Managemen Group Ashridge Conference Centre 8 April 2008

  2. Luton Airport Road Schemes Core elements of TRANSPORT sustainability & performance Management in South Bedfordshire and Luton A5-M1 Link Road Transport Assessment Framework (Area-wide modeling) Junction 11a North LutonBypass Woodside Connection J6a – J10 Aircraft Noise Surface Access M1 Widening BCC, LBC, HA, DFT, LACC J10 – J13 Members, Portfolio Holders Communication & Liaison Luton-Dunstable Busway Traffic Management/Road Safety Core route Extension to growth area LESS CONGESTION SAFER ROADS LESS POLLUTION AIR/NOISE Sustainability Masterplan Road Schemes ROADS/RAIL IMPROVE-MENTS

  3. Thank You. Manouchehr Nahvi End show

  4. Points of concern1-Currently, construction of the Bypass (and J11a) is programmed to start in 2013/14 and to open to traffic in 2015/16. However, the councils and the local MP are urging the HA, DfT and DCLG to try and bring forward the dates.2- Concern about the lack of appropriate pedestrian/cycle route across the M1 at J12 Return

  5. Return

  6. return

  7. TAF Current work • Each of ten strategy development option being appraised to assess, in relative terms, their transport based sustainability in terms of ensuring that: • Both existing and new residents have the highest achievable degree of accessibility to employment places • Both existing and new employers can draw upon the widest number of employed residents • Overall, residents in any given area have the maximum level of accessibility to residents in other areas. return

  8. Sustainable developments • Consider the location of Growth points in terms of their connectivity to large urban areas, major zones of employment, retail/leisure facilities and the existing road and rail network • Endeavour to provide a variety of employment opportunities and other community facilities (such as schools, health centres etc) on site to reduce the need to travel • Ensure that Growth Points are planned to best integrate with existing land-use. return