1 / 6

TEN-T Info Day for AP and MAP Calls 2012

TEN-T Info Day for AP and MAP Calls 2012. Roads. Yiannis Argyropoulos TEN-T EA Head of Unit T2 – Road and Rail Transport TEN-T Info Day 2012 29 November 2012. Funding Opportunities for Roads.

cady
Download Presentation

TEN-T Info Day for AP and MAP Calls 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TEN-T Info Day for AP and MAP Calls 2012 Roads Yiannis Argyropoulos TEN-T EA Head of Unit T2 – Road and Rail Transport TEN-T Info Day 2012 29 November 2012

  2. Funding Opportunities for Roads Annual Call, Priority 1: to accelerate/facilitate the implementation of TEN-T projects, including studies and works formature projects for all modes, namely rail, inland waterways, maritime, road and multi-modal, as part of the projects of common interest, in accordance with Article 7 of the TEN-T Guidelines. Notes: - Actions including sections on any priority project, in accordance with art. 23 of the TEN-T Guidelines may not be supported under this priority. - Multi-Annual Call: Priority Projects which concern Roads (7, 12, 13, 25)

  3. Objective of Multi-Annual Call Priority 1 The programme aims at channelling Union aid at supporting sections of priority projects (in the rail, road and inland waterway sectors) which promise the highest EU added value for the projects as a whole, i.e. cross-border sections and the removal of bottlenecks

  4. Types of Projects • Studies aiming at: • creation of a mature project pipeline for 2014 and beyond; • acceleration of the implementation of projects (e.g. environmental studies/design studies versus feasibility studies) and leading to physical implementation • Works for mature projects to be completed by 2015, where the EU added value is clearly demonstrated

  5. Objective of Annual Call Support the development of roads as a component of an integrated transport system Works projects to be selected shall include at least one of the following aspects: • cross-border sections or in the case of Member States without a rail network, bottlenecks or missing links; • safety and security measures (including development of safe rest areas for professional drivers); • integration strategies with other ‘lower’ carbon transport infrastructure.

  6. Thank you! TENT-AGENCY@ec.europa.eu http://tentea.ec.europa.eu TEN-T Info Day 2012 – 29 November 2012

More Related