Floodplain Management Ordinance Public Hearing September 22, 2009

Floodplain Management Ordinance Public Hearing September 22, 2009. PRESENTATION OUTLINE. Overview Proposed Ordinance Revisions Recommended Board Action. OVERVIEW. Orange County participates in the National Flood Insurance Program (NFIP)

caelan
Download Presentation

Floodplain Management Ordinance Public Hearing September 22, 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Floodplain Management Ordinance Public Hearing September 22, 2009

  2. PRESENTATION OUTLINE • Overview • Proposed Ordinance Revisions • Recommended Board Action

  3. OVERVIEW • Orange County participates in the National Flood Insurance Program (NFIP) • Allows residents to purchase flood insurance in flood prone areas

  4. OVERVIEW When FEMA issues new maps and study a community must: • Adopt new maps and study • Amend existing ordinance to comply with minimum NFIP requirements

  5. OVERVIEW Current Floodplain Management Ordinance approved in 1982 FEMA regulation changes Participation in the NFIP requires adoption and enforcement of minimum floodplain management standards FEMA Model ordinance used to update countyordinance

  6. OVERVIEW • July 16, 2009 Public Works Advisory Board • August 5, 2009 Professional Resource Group • August 5, 2009 1st DAB • August 12, 2009 2nd DAB • August 19, 2009 3rd DAB • August 20, 2009 LPA Work Session • Sept. 2, 2009 4th DAB • Sept. 9, 2009 5th DAB (Approved) • Sept. 17, 2009 LPA Public Hearing (Approved) • Sept. 22, 2009 BCC Public Hearing

  7. PRESENTATION OUTLINE Overview Proposed Ordinance Revisions Recommended Board Action

  8. ORDINANCE REVISIONS Floodplain Ordinance has three articles with twenty eight sections Nine sections of the ordinance have changes incorporating the model language The remaining nineteen sections have mainly grammatical and text clarifications

  9. ORDINANCE REVISIONS Article I New definitions added and existing definitions revised Examples include critical facilities, existing construction, freeboard, flood proofing Adopts new maps dated Sept. 25, 2009 Violations section updated

  10. ORDINANCE REVISIONS Article II New text clarifying floodplain administrator’s responsibilities Appoints Public Works Director (or designee) Grants/denies floodplain permits Variance procedures New text authorizes appeals to be heard by Development Review Committee

  11. ORDINANCE REVISIONS Article II Appeals to Development Review Committee New text explaining appeals process Appeal must be made within 30 days of permit denial Public hearing within 30 days of receiving appeal request Variance may be granted with conditions

  12. ORDINANCE REVISIONS Article III General Standards New text specifying the need for subdivision proposals to minimize flood damage Applicant to provide state & federal permits Compensating Storage to be provided in same basin Specific Standards New manufactured homes must provide proper anchoring to resist flotation or lateral movement Critical facilities (e.g. Hospitals, Jails) to be located above the 500 year floodplain

  13. ORDINANCE REVISIONS Additional Amendments Replace the phrase “erection, addition or substantial alteration improvement of any building or structure or portion thereof,” with “commencement of any development” on page 9, at lines 338-341. Delete references to Sections 320.8359 and 161.053, F.S., on page 19, at lines 807-808. Insert the phrase “at the sole cost of the applicant.” at the end of sentence on page 22, at line 968. Strikethrough “Regulation” on page 27, at line 1169. Replace the phrase “determine whether” with “assure that” on page 38, at line 1699.

  14. PRESENTATION OUTLINE Overview Proposed Ordinance Revisions Recommended Board Action

  15. BOARD ACTION Approve and Adopt the Ordinance amending Chapter 19, Floodplain Management, Article I through Article III. Grant staff permission to correct scrivener’s/non-substantial typographical errors.