1 / 26

RESULTS MANAGEMENT FOR PUBLIC SECTOR EXCELLENCE TRANSPORT SECTOR SINGAPORE, 5-9 SEPTEMBER 2011

COUNTRY REPORT ROAD SECTOR DEVELOPMENT IN INDONESIA. RESULTS MANAGEMENT FOR PUBLIC SECTOR EXCELLENCE TRANSPORT SECTOR SINGAPORE, 5-9 SEPTEMBER 2011. DIRECTORATE GENERAL OF HIGHWAYS STRATEGIC PLAN 2010-2014. STRATEGIC PLAN DIRECTORATE GENERAL OF HIGHWAYS 2010-2014. Vision.

caelan
Download Presentation

RESULTS MANAGEMENT FOR PUBLIC SECTOR EXCELLENCE TRANSPORT SECTOR SINGAPORE, 5-9 SEPTEMBER 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. COUNTRY REPORT ROAD SECTOR DEVELOPMENT IN INDONESIA RESULTS MANAGEMENT FOR PUBLIC SECTOR EXCELLENCE TRANSPORT SECTOR SINGAPORE, 5-9 SEPTEMBER 2011

  2. DIRECTORATE GENERAL OF HIGHWAYSSTRATEGIC PLAN 2010-2014

  3. STRATEGIC PLAN DIRECTORATE GENERAL OF HIGHWAYS 2010-2014 Vision • The realization of a reliable, integrated and sustainable national road network to support economic growth and social welfare. Mission • Realizing sustainable national road network of sufficient mobility, accessibility and safety, to serve national and regional activity centres as well as national strategic areas • Realizing inter-urban national freeway network and in urban areas with intense logistical movement connecting and serving major national economic activity centres • Facilitating local governments capacity in sustainable road management to provide mobility, accessibility and safety 3

  4. CONCEPT OF ROAD NETWORK FORMULATION • Law /Regulation on Road : • UU No. 38 TH. 2004 • PP No. 34 TH. 2006 • PP No. 15 TH. 2005 • (on Toll Road) • UU, PP ttgLaluLintas : • UU No. 14 TH. 1992 • UU No. 22 TH. 2009 • PP. No. 43 TH. 1993 PRIMARY ARTERIAL • RTRWN • UU No. 24/ 1982 • PP No. 47 TH. 1997 ttg RTRWN • ENVIRONMENT PRIMARY SYSTEM (NATIONAL) PRIMARY COLLECTOR PRIMARY LOCAL JAR. TRANSP. NAS./SISTRANAS (Land Transport, Road sub sector) (MID TERM & LONG TERM) SECONDARY ARTERIAL MID TERM AND LONG TERM POLICY AND STRATEGY OF ROAD MANAGEMENT SECONDARY SYSTEM (URBAN) • GROWTH • EQUALITY SECONDARY COLLECTOR SECONDARY LOCAL 4

  5. LOGISTIC SYSTEM • The increasing competition at global level impose every country and business players to improve effectiveness and efficiency of logistic system • The performance of Indonesia’s logistic sector is not yet optimum due to high logistic cost and low service level 5

  6. LOGISTIC PERFORMANCE OF INDONESIA AMONG ASEAN+6 6

  7. NATIONAL CONNECTIVITY FRAMEWORK Locally Integrated, Globally Connected 7

  8. NATIONAL CONNECTIVITY FRAMEWORK(Continued) Integration of Sislognas, Sistranas (multimodal transport, master plan of seaport, airport, road, and railway) and regional development plan Ports Roads This framework considers the natural condition, geography and demography Railways Airports Multimodal 8

  9. VISION OF CONNECTIVITY FRAMEWORK: LOCALLY INTEGRATED, GLOBALLY CONNECTED 3 Levels of Connectivty City Town Asia Island Town City Indonesia International Gateway Town Europe Town Island City Town City America Town Island Town Intra-island International Inter-island Within Growth Poles (urban) Among Growth Poles (sub-regions) City Town LOCAL Connectivity NATIONAL Connectivity GLOBAL Connectivity 9

  10. NATIONAL DEVELOPMENT CORRIDOR BASED ON NATIONAL SPATIAL PLAN (RTRWN) Benggala Gulf, Mediteran, Indian Ocean (Middle East, Europe) South China Sea (Japan, Korea, Philippine) South China Sea (Hongkong, China, Taiwan) Pacific Ocean (Japan, Korea, USA, Canada) Lhokseumawe BANDAR SRI BEGAWAN KUALA LUMPUR Simanggaris Mebidang Pacific Ocean (USA, Canada, Latin America) Entikong Bontang Ternate Dumai Manado SINGAPORE Bontang Gorontalo Pekanbaru Pontianak Batam Samarinda Jambi Sorong Biak Palu Palangkaraya Pangkalan Bun Padang Jayapura Palembang Ambon Kendari Banjarmasin Bengkulu Bandar Lampung Makasar Bau-bau Serang Jakarta Bandung Surabaya Semarang Malang Yogyakarta Denpasar Mataram Merauke DILLI Kupang Indian Ocean (Africa, Australia) Indian Ocean (Australia, New Zealand) National/Global Strategic Development Axis International Seafare Route Sub-Regional Economic Cooperation Major Island Production Area ZEE Border National Activity Centres National Strategic Development Axis Ocean Production Area 10 Regional Activity Centres Sumber: Ditjen Penataan Ruang Nasional, 2009.

  11. DEVELOPMENT OF 6 PRIORITY ECONOMIC CORRIDOR 11

  12. NATIONAL ROAD ASSET • NATIONAL ROAD • Length of national road according to Ministerial Decree No. 631/KPTS/M/2009 dated December 31st, 2009 is 38.569,83 km located on 33 provinces. • TOLL ROAD • Length of toll road according to Ministerial Decree No. 631/KPTS/M/2009 dated December 31st 2009 is 757,47 km located on : • Sumatera Island 42,70 Km • Java Island 697,12 Km • Sulawesi Island 17,65 Km 12

  13. RELATION BETWEEN ROAD CLASIFICATION AND MANAGEMENT AUTHORITY NOTE : K1 = CONNECTING AMONG PROVINCIAL CAPITALS K2 = CONNECTING PROVINCIAL CAPITAL WITH DISTRICT CAPITAL/CITY K3 = CONNECTING AMONG DISTRICT CAPITALS OR CITIES K4 = CONNECTING DISTRICT CAPITAL WITH SUB-DISTRICT 13

  14. DG OF HIGHWAYS OBJECTIVE 2010 - 2014 Percentage of road network in a stable condition increase up to 94%; Length of road to be expanded in terms of capacity about 19.370 km or increase of 13.000 lane-km; Facilitation of regional/local road development to achieve 60% of stable condition. 14

  15. MEASURES FORPERFORMANCE MANAGEMENT

  16. PERFORMANCE STATEMENT • Annual performance plan is suited with budget availability according to budgeting process documents. • Performance statement is a quantitative government’s commitment for one year period. • Performance statement is agreed among program implementator and the superior (performance agreement) at each government institution. 16

  17. CYCLE OF PLANNING PROGRAMMING & BUDGETING Nota Keuangan (NK) Meeting With Parliament Satuan-3 (RKA-KL) INDICATIVE CEILING TEMPORARY CEILING MUSRENBANG DEFINITIVE CEILING Committed Project TRILATERAL MEETING Road Condition Year-N Program Recommen- dation IRMS RKP/RENJA KONREG Condition Survey Implementation SAPSK/DIPA 17

  18. STRATEGIC FRAMEWORK OF ROAD MANAGEMENT IRMS ROAD PRESERVATION UNCONSTRAINED BUDGET NEEDS KONREG CAPACITY EXPANSION FS REGIONAL DEVELOPMENT 18

  19. CONCEPT OF ROAD PRESERVATION Road deterioration curve with maintenance Periodic Maintenance Structural Improvement Po Pt Service Capacity IDEAL PATH Deterioration curve condition without maintenance CRITICAL LIMIT Routine Maintenance Routine Maintenance Routine Maintenance Age (year) 19

  20. TYPES OF ROAD ACTIVITY • ROUTINE MAINTENANCE • Treatment for road surface to increase riding quality, without improving structural strength and being done all year round. • PERIODIC MAINTENANCE • Maintenance type which being done in periodic sequence and to increase structural strength (example: 1 layer overlay) • RECONSTRUCTION • Treatment for recovering road condition into good state (example: 2 layers overlay and foundation improvement) 20

  21. TYPES OF ROAD PAVEMENT • Flexible Pavement • Service period 10 years • Low up to heavy traffic • Uneven settlement (not stable) • Rigid Pavement • Service period 20 years • Heavy traffic • Excellent subgrade with even settlement (stable) 21

  22. UTILIZATION OF TECHNOLOGY AND MATERIAL • UTILIZATION OF TECHNOLOGY • Recycling is used when the need for overlay is more than 15 cm; • Preventive technology for maintenance; • Concrete pavement technology for road construction; • UTILIZATION OF MATERIAL • Optimizing the utilization of local materials (stabilization technique) using cement or lime; • Buton Asphalt; • Functional steel truss bridge remain used while bridge with critical condition will be replaced with concrete. 22

  23. IMPLEMENTATION METHOD • Impelementation method of road project are : • Self-contract • Implemented by Road Preservation Unit supported by Routine Maintenance Unit and Road Inspector. • Contractual • Single year contract • Multi years contract 23

  24. MANAGEMENT OF SATKER (PROJECT) AND PPK (SUB-PROJECT) • Project Office for National Road Development based on area (road sections) and its number in each province depends on the work load, span of control and geographic condition; • Project Office performance target is formulated based on the national road performance in its area. • The working area of sub-project office is about + 100–200 Km, for metropolitan cities the working area+25-50 Km; • In a specific area of sub-project manager with special activity it is possible to create special sub-project office. 24

  25. PERFORMANCE EVALUATION LAPORAN AKUNTABILITAS KINERJA INSTANSI PEMERINTAH (LAKIP) / PERFORMANCE ACCOUNTABILITY REPORT OF GOVERNMENT INSTITUTION Document which explains about the realization of performance accountability and being systematically and institutionally reported by each unit. 25

  26. THANK YOU